Skip to Main Content
Autodesk
ADD A NEW IDEA

River Modeling

Showing 27 of 1309

Add an option to 'apply rainfall' directly to river reach objects

Currently a user would need to define a subcatchment to generate runoff for a river reach. This is okay for 1D models but for 1D/2D models, especially 2d runoff models it adds some additional steps for the user. It would be nice for add a 'apply r...
Alex Grist 9 days ago in InfoWorks ICM / River Modeling 1 For Review

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest about 2 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest about 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest about 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Enable Data Flags for bed levels and roughness values in river section data

Enable data flagging for the bed level and roughness values within the river cross section data. This information was available in RS and is sorely missed.
Guest over 5 years ago in InfoWorks ICM / Flags / River Modeling 0 Gathering support

Spread automatic inserted vertices in Bank Lines equally

The "Update from ground model" provides the option to “Insert vertices on lines to give maximum spacing of x m”. This is very useful for creating Bank Line vertices at small intervals. It would be helpful if those inserted vertices are spread equa...
Guest over 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 4 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

River bank cumulative flow

It would be great to have the ability to graph bank flows and have a cumulative flow result available.
Guest over 5 years ago in InfoWorks ICM / River Modeling 1 Gathering support

Time varying roughness values for rivers

As vegetation changes throughout the seasons, it would be great if we could also have time varying roughness patterns for river reaches.
Guest over 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 0 Gathering support

Conveyance on cross section lines

Provide cross section conveyance for each cross section
Guest over 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 1 Gathering support