Skip to Main Content
Autodesk
ADD A NEW IDEA

Data Exchange

Showing 11 of 1244

Easier data exchange for pump curves

We want an easy way to export out all pump data, including the pump curve information.Currently to do this using Open Data Export Centre, you need to manually add the pump triplet fields after clicking Auto-map.We want an easier way to get all the...
Nathan Gerdts 15 days ago in InfoWorks WS Pro / Data Exchange 1 For Review

Improve SQL spatial search to join line objects based on overlap

GIS data often misses pipe splits or lacks suitable asset IDs in the model. Updating the model over time from changes in GIS would be improved by having an option to exchange data and flags spatially through SQL Query (after primary data exchange ...
Nathan Gerdts 6 months ago in InfoWorks WS Pro / Data Exchange 0 For Review

Add CAD importer to Open Data Import/Export

Currently the import from CAD .dwg is a separate importer with less features than the full Open Data Import/Export options. It'd be great to simplify and bring this into the standard import/export exchange, especially since WS Pro is now an Autode...
Tim Medearis 12 months ago in InfoWorks WS Pro / Data Exchange 0 For Review

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest about 5 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

Create a ground model using LIDAR data in a .tif format

LIDAR data is now typically stored in a .tif format as opposed to .asc, and so it would be useful to be able to create a ground model in Infoworks WS Pro using .tif data.
Guest about 4 years ago in InfoWorks WS Pro / Data Exchange 0 Under consideration

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan over 5 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub 8 months ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Copy all the scenarios from a Model

I would like to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario. Thanks
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Copy all the scenarios from a Model

Impossible to make a subsystem copy of a model (with different scenarios) that brings all the scenarios to the new model when I make a copy of the selected nodes and links. At this moment, a copy only brings the current scenario.
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

The "join model" tool does not work correctly with Scenarios

The Infoworks Join Model Tool does not work correctly with Topologies and Controls containing different scenarios In the resulting united model, it maintains the four scenarios, but in all four scenarios the Topology and Control are the same, it r...
Juan Carlos Ortega almost 2 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support