Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 138 of 1423

Empty the entire recycle bin for Autodesk Cloud Databases

This is already available for Workgroup databases. Deleting objects from the bin one by one is painful.
Saul Bradford about 13 hours ago in InfoWorks ICM / Productivity 0 For Review

InfoAsset Manager - Create Ruby Method for Expand Selection

Although not available in InfoWorks ICM the Expand Selection tool in InfoAsset Manager is EXTREMELY useful. This is because there are many InfoAsset Object types associated, connected and components of each other. The ability to create and establi...
Anthony Andrews about 1 month ago in InfoWorks ICM / Productivity 1 For Review

Add validation for errors causing simulation to fail

If a conduit has a cross section with zero width, the simulation will fail with the following message: "Fatal 37: INTEGRITY FAILURE: geo_setup - invalid conveyance for ABC474.1, section 1". The validation does not catch this error. It would be hel...
Corina Overman 10 days ago in InfoWorks ICM / Validation 1 For Review

Enable Exchange Ruby method for carrying out spatial analysis in Workgroup Products

SQL tool in InfoAsset Manager enables users to perform spatial analysis of a variety of types using a selection of layer types. This is an extremely important and useful analytics tool which avoids the need for a user to export data out of InfoAss...
Anthony Andrews 5 months ago in InfoWorks ICM / API / Exchange 1 Gathering support

Bring back the CS feature of being able to mark a network (or really any database item) as 'current' - with a visual cue (eg coloured border) around the icon.

In a master database there are often many different network objects, modelling files, stats templates etc that are required as part of a complete audit trail. Naming schemes are often fixed or unhelpful. It would be useful for collaborators to see...
Saul Bradford 5 months ago in InfoWorks ICM / Tree View 1 For Review

Process statistical reports from Ruby and ICM Exchange.

As part of DWMP running TSR "en masse" may be a requirement.We would like to code these in and export the statistical report results onc ethey are complete.This would save a great deal of time and would be processed in the background.There will be...
Jose Pereira over 1 year ago in InfoWorks ICM / API / Exchange 1 Under consideration
108 VOTE

Support for multiple screens

Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Ann Pugh over 6 years ago in InfoWorks ICM / Productivity 4 Will not implement

2D meshing using Ruby and ICM Exchange

As part of DWMP we are likely to need to create multiple scenarios for each network based on Growth (2035, 2045 etc...). One of the approaches ot the detriment anaylsis will require a 2D approach. Would it be possible to allow meshing from within ...
Jose Pereira over 1 year ago in InfoWorks ICM / API / Exchange 2 Under consideration

Integration of Vector Geoprocessing Capabilities in Ruby for InfoWorks ICM

I propose adding support for core vector geoprocessing operations such as clip, buffer, intersection, union, symmetrical difference, and similar tools directly within the Ruby scripting environment in InfoWorks ICM. This enhancement would signific...
Sebastian Madrid 9 months ago in InfoWorks ICM / API / Exchange 3 Gathering support

Better scenario comparison tools

Comparing changes/differences between scenarios is a chore as it can only be done via manually checking objects or looking through a text file showing the differences. I recommend 2 improvements. 1) be able to see different scenario attributes sid...
Andrew Sherson 10 months ago in InfoWorks ICM / Tree View 3 Gathering support