Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 24 of 1423

Continuous Matched Soffits or Inverts Snapping

It would be useful if all pipes in a junction automatically snapped to match either soffits or inverts. There is a variable in the Network Design Criteria for 'Level Soffits' or 'Level Inverts' so potentially this option could be used for the live...
Ian George about 2 months ago in InfoDrainage / Productivity 0 For Review

Retaining CAD files / Orphaning

When CAD files are imported to InfoDrainage they retain the link to the CAD file, like a CAD Xref which is good. However if that file is moved, or InfoDrainage cannot access it, an error box is prompted and the entire CAD file is just deleted from...
Ian George about 1 month ago in InfoDrainage / Productivity 0 For Review

Improved catchment area import

Importing the catchment areas from cad is an extremely useful feature which would save hours of time, however, it does not work with all the areas and specifically not those with curved lines (most of the time). I think if infodrainage could impor...
Henry Wilkinson 6 months ago in InfoDrainage / Productivity 1 Under consideration

Outfall Details input window

The Outfall Details input window is of fixed size, in width and height. This makes using the "Level Curves" tab difficult, as in order to select a set of different hydrographs for different storm events, one must constantly scroll right and down t...
Nicholas Bond about 1 month ago in InfoDrainage / Productivity 0 Gathering support

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest over 1 year ago in InfoDrainage / Productivity 2 Will not implement

Add max pipe flow to the pipe properties window

Max pipe flow (theoretical pipe full) is not listed in pipe properties, as it was previously in MicroDrainage. It was a useful feature.
Ian George 3 months ago in InfoDrainage / Productivity 0 For Review

Graphical editing in Longsection

Being able to manually drag pipes up/down and alter their gradient in the long section graphics, was an extremely efficient workflow in Microdrainage, especially when using min. pipe design levels to dictate land-raise FGLs. Can this function be c...
Guest 12 months ago in InfoDrainage / Productivity 0 For Review

Ability to look at multiple phases (surface and foul networks together) in 3D

Being able to view both surface and foul networks within MicroDrainage was always a very useful feature to visualise crossing points in the network and it doesn't look to have been included in InfoDrainage.
Henry Wilkinson 10 months ago in InfoDrainage / Productivity 1 For Review

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky about 1 year ago in InfoDrainage / Productivity 0 For Review

Manhole Types

Please allow us to specify manhole types (DMRB, SSG etc.) and covers and ensure that this data is visible in the manhole schedule export
Guest about 2 years ago in InfoDrainage / Productivity 1 Gathering support