Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson about 1 month ago in InfoDrainage / Auditing / Reviewing 0 For Review

Ability to change flow path in the profile view

It would be very convenient to be able to select a different flow path from within the long section (profile) view.
Matthew Johnson about 1 month ago in InfoDrainage / Auditing / Reviewing 0 For Review

Sort and collapse all option in flowpath Network Design Report

It would be useful to be able to ‘collapse all’ for branches in the Network Design Report. It would also be useful to be able to sort the connections (and junctions) in order of upstream→downstream or alpha/numeric. At the moment it seems rather a...
Matthew Johnson about 1 month ago in InfoDrainage / Auditing / Reviewing 0 For Review

Show catchment areas of non-current phases

It is useful to be able to see the catchment areas of non-current phases if they have visibility switched on. For example, to make sure that a whole site with multiple outfalls has the total catchment digitised with no gaps.
Matthew Johnson about 1 month ago in InfoDrainage / Auditing / Reviewing 0 For Review

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest about 1 month ago in InfoDrainage / Auditing / Reviewing 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 2 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest 7 months ago in InfoDrainage / Auditing / Reviewing 2 Gathering support