Reduce the width of the statistics table in the observed/predicted graphs

The statistics table in the Observed/Predicted graph takes up the majority of the width of the frame, resulting in the the sim name being truncated. The table seems to be unnecessarily wide and this is further exacerbated by the width of the colou...
Greg Jones about 1 month ago in InfoWorks ICM / Reporting 0 For Review

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 7 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Improve print layout functionality

The print layout functionality is incredibly basic and hasn't been improved for several years. At present, we tend to export results out of Infoworks and use 3rd party GIS to produce figures as the Infoworks layout tool isn't sufficient to create ...
Unknown Unknown over 2 years ago in InfoWorks ICM / Printing 2 Gathering support

Update Custom Graph functionality to cover more results

The current custom graph options, including Observed/Predicted and Flexible reports don't cover the full range of results available inside of ICM. This makes creating graphs and reporting the results difficult especially in the River and Water Qua...
Alex Grist about 2 years ago in InfoWorks ICM / Reporting 1 Gathering support

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng over 2 years ago in InfoWorks ICM / Reporting 0 Gathering support

Change formatting of '2D level boundary below ground level' in the timestep log

Other warnings such as manhole shaft/chamber area occur with only one line of text with the '(and possibly others)' text. Could something similar be introduced for the '2D level boundary below ground level' warning in the timestep log? This warnin...
Tom Newman over 1 year ago in InfoWorks ICM / Reporting 1 Under consideration

Bank line export for inline banks

If you export ICM results, the inline banks are now exported as the lines between the 2D outfall and the node that determines the 1D level. This is a meaningless object, whereas exporting the bank line geometry that is attached to it makes it much...
Marcel Glasbergen about 2 years ago in InfoWorks ICM / Reporting 1 Gathering support

Easier to interrogate log results file

In the review of a model we use the log results to identify whether the model has particular problems and review the overall mass balance. The log results are in text format and it is fairly annoying scrolling through the find the items needed. Co...
Guest about 3 years ago in InfoWorks ICM / Reporting 2 In progress

Order ARR19 Box and Whisker plots by duration

The box and whisker plot outputs order alphabetically. It would be useful if it ordered based on rainfall event duration instead.
Guest almost 4 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Retain decimal places when copying/pasting grid values

For most numerical values in a model, ICM can hold 8 decimal places. From the grid view, if you copy/paste a single cell value, the full set of decimal values are preserved. However, if you copy multiple cell values at once (e.g. an entire column)...
Jason Kulsdom almost 4 years ago in InfoWorks ICM / Grids / Reporting 0 Gathering support