Skip to Main Content
Autodesk
ADD A NEW IDEA

Simulations

Showing 79 of 1244

In-sewer water temperature model

In-sewer water temperature monitoring has been around for a while. It is useful for identifying groundwater infiltration, potential heat recovery locations, optimising chemical dosing, predicting H2S build up and other key sewer processes. A dynam...
John Ward about 1 month ago in InfoWorks ICM / Simulations 2 For Review

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist 4 months ago in InfoWorks ICM / Results 2 For Review

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott 3 months ago in InfoWorks ICM / Results 1 For Review

Improve database and results files read performance

When opening an ICM network for the first time (i.e. no network files in the local files "Working" folder), the WDS reads through the database file in 4 kB chunks to retrieve the requested version of the network. This read process appears to be li...
Peter Dunlop about 3 years ago in InfoWorks ICM / Performance / Results 3 Gathering support

Info360 Model information

Especially because of the limit of cloud simulation time we run into and having to ask colleagues to start runs, it would be very helpful if the Info360 Model would provide more information on the status of the simulations running. Now it is only ...
Marcel Glasbergen 4 months ago in InfoWorks ICM / Performance 1 In progress

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker 8 months ago in InfoWorks ICM / Results 1 Already exists

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford 12 months ago in InfoWorks ICM / Results 2 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest almost 2 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support