InfoWorks WS Pro

Synchronise the Geoplans of two or more runs

When comparing between 2 runs, it is useful to do this visually using the Geoplans of these runs. Currently while you can highlight common components (pipes, valves etc..) the Geoplans to not move together (i.e. you move to a set of coordinates on...
Guest 4 days ago in InfoWorks WS Pro / Other 0 For Review

Apply fire-flow constraints only to nodes upstream of the hydrant in Hydrant Testing run

When running a Hydrant Testing run, there are only options to apply constraints globally or to the Fire Zone of the hydrant being testing. If the constraint node is downstream of the hydrant being tested it is likely that the reported hydrant flow...
Guest 4 days ago in InfoWorks WS Pro / Other 0 For Review

Include contributing pipes in suppressed demand log entries

When additional log entries are enabled, please include which pipes are contributing to suppressed demand. The current log indicates that demand has been suppressed but doesn’t make it easy to identify the pipes responsible. Including the pipe IDs...
Oliver Sanderson 11 days ago in InfoWorks WS Pro / Engine 0 For Review

Separate demands from the Network and Control object

Have the demand amount (l/s, l/p/day, etc) not within the Network object or Control object but a separate object. As customer demand and transfers differ for different times of year, where as the real network and majority of how it is controlled r...
diua huihbiu 27 days ago in InfoWorks WS Pro / Engine 0 Gathering support

Improved Multi‑Selection Handling to Prevent Accidental Deselection

In InfoWorks WS Pro, selecting multiple objects requires holding Ctrl while clicking. If Ctrl is accidentally released, the entire selection is cleared when another object is selected, which can be frustrating when working with large selections. I...
Callum Collier 7 months ago in InfoWorks WS Pro / Other 2 Gathering support

add ability to downgrade databases

We need the ability to downgrade databases, or to have the export / reimport process automated so we can push a button to create a copy of a DB in a previous software version. New releases for WS Pro software come out frequently, but it is not nec...
Ben Davies 5 months ago in InfoWorks WS Pro / Data Exchange 0 For Review

Scenarios in IWLive

Currently, it appears that scenarios set up in InfoWorks Pro cannot be viewed within IWLive. This is a significant drawback, as scenarios such as peak demand conditions are often used and need to be interrogated within IWLive. I think adding in th...
elizabeth Richardson 9 months ago in InfoWorks WS Pro / Engine 0 Under consideration

Make it obvious if UPC active on the pump / valve control properties

It can be extremely frustrating to troubleshoot valve or pump operation using valve / pump control options, only to discover that a UPC is overriding them. The pump / valve control options should be greyed out if UPC is active and overriding to ma...
Guest 5 months ago in InfoWorks WS Pro / Engine 0 Gathering support

Go to a node or link from a graph

It would be useful if you could simply Right-Click a graph and there be an option to "Go to node/link" to quickly go to it in the geoplan.
William Tracey 11 months ago in InfoWorks WS Pro / Other 0 Gathering support

Demand Area Analysis: Factoring Multiple Categories

Currently, Demand Area Analysis only allows demand adjustment to one Leakage and one Unmetered category at a time.It would be very useful to be able to factor additional demand categories such as:Average CustomersMetered DomesticCommercial (e.g. 1...
elizabeth Richardson 11 months ago in InfoWorks WS Pro / Other 3 Gathering support