"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King 4 months ago in InfoWater Pro / Other 1 In progress

Please add an Innovyze section to the autodesk forums

Hello, Innovyze previously had a forum available for their products. After the software was purchased by autodesk, this no longer seems to exist. I believe having a forum where users can post questions and troubleshoot their issues would be very h...
Endrit Shabani over 1 year ago in InfoWater Pro / Other 2 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg 11 months ago in InfoWater Pro / Other / Productivity 0 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane 9 months ago in InfoWater Pro / Other 0 Gathering support

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 3 months ago in InfoWater Pro / Other 0 For Review

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 4 months ago in InfoWater Pro / Other 0 For Review

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani about 1 year ago in InfoWater Pro / Other 0 Gathering support

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks over 5 years ago in InfoWater Pro / Other 2 Under consideration

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts almost 2 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts almost 2 years ago in InfoWater Pro / Other 0 Gathering support