Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1372 of 1372

worst case Grid report to include min values

Can the worst case grid report be enhanced to include minimum values for velocity and flow, similar to how it currently reports maximum upstream and downstream flow? This addition would be highly beneficial for understanding hydraulic behavior dur...
Parameswara Rao Narra 5 months ago in InfoWorks ICM / Results 3 Already exists

Pipe Properties Table

It would be really nice to add a pipe properties management table to help manage roughness factors and wave speeds. This is a feature in KyPipe: Surge and it is extremely helpful when assigning wave speeds to pipelines. The table classifies pipe t...
Guest 4 months ago in InfoWater Pro / Productivity 1 Gathering support

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest about 1 year ago in InfoDrainage / Productivity 1 For Review

Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Scenarios should stop tracking differences when values return to default

Our organisation is using scenarios to manage alternate model configurations like Peak Day, Average Day, etc. in our main working model. Over time some field values will change from the Base value, and then change back (or the other way around, wh...
Dave Watts 3 months ago in InfoWorks WS Pro / Other 1 Under consideration

Comparing the inputs of two runs

When I have two runs, I can compare the results of both of them. But for some cased I would need to compare the parameters or simulation options. This would be similar to comparing two versions of network database but its focusing globally on the ...
Guest about 1 month ago in InfoWorks WS Pro / Productivity 2 Gathering support

Ability to conduct batch edits in CCTV inspection page

Currently, the user can make manual updates to CCTV inspections. However, in many cases they will want to edit inspections in batch. One common example is the Us/DS manholes do not match for hundreds (even thousands) of inspections. Rather than de...
Martha Nunez about 1 year ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows 0 Gathering support

Add check dams as a feature for swales

Add a check dam setting with height, notch weir and interval settings to simplify modelling swales on sloping sites. This avoids having to model several sections of swale in order to use the available storage.
Oliver Dodd about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Expand gauged object results to all result fields

Currently the gauged object result fields are limited. For instance, they do not include 2d related results at nodes. As the use case for ICM has expanded so has the information that users are interested in. No longer as they just looked at 'flow ...
Alex Grist about 1 year ago in InfoWorks ICM / Results 3 Under consideration

Improve ground infiltration simulation parameters.

Could we have a 'Node level affects groundwater infiltration' for the soil store please? This simulation parameter was introduced to InfoWorks ICM recently to limit infiltration from the ground store to the model. Could this be extended to limit f...
Tom Walker over 4 years ago in InfoWorks ICM / Calibration / Groundwater / Hydrology 0 Gathering support