InfoAsset Mobile - Grid Sorting

When a selection of schedulable objects is made they are not ordered. They should be ordered preferably by the date completeled, with the latest survey at the very top of the grid.
Idris Nujjoo about 1 month ago in Info360 Asset / General 3 In progress

Velocity Result for Swale Stormwater Control Feature

The velocity parameter in a swale is an important consideration with respect to determining erosion possibility, potential swale lining requirements and help inform check-dam design & locations. As it stands you cannot get the velocity result ...
Shane Moynihan 9 months ago in InfoDrainage / Hydraulics 1 In progress

User defined CCTV inspection codes, scores, grades and algorithm

As a user I would like to be able to define and use in Info360 Asset my company's CCTV inspection standard. This would include user defined CCTV inspection codes, scores, grades and algorithm
Tony Andrews 3 months ago in Info360 Asset / Inspections 0 In progress

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez 7 months ago in Info360 Asset 1 In progress

Stub out CCTV Lateral Defects

In InfoAsset Planner, the CCTV data for laterals was stubbed out and drawn into the GIS as a polyline. In Info360 Asset, these 'defects' are still visualized only as a point on the pipe, as an 'X'. Seeing the laterals is extremely valuable and 'pa...
Tim Medearis over 1 year ago in Info360 Asset / Map visualization 3 In progress

"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King 6 months ago in InfoWater Pro / Other 1 In progress

Create a stormwater system type

It would be useful to be able to manage stormwater networks separately from sewer
Brad Thompson about 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 In progress

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis about 1 year ago in Info360 Asset / Data Editing 1 In progress

Innovyze rewiewing & acting upon the suggestions in this forum more quickly

I would like Innovyze (Autodesk)to provide more resources to actively review the great suggestions in this this forum. However it seems that months and even years go past and the suggestions just sit there showing as received.
Gregory Smith almost 3 years ago in InfoWorks ICM / Other 1 In progress

Run Ruby Exchange Scripts from UI

It would be useful to have an official mechanism for running an Exchange script from the UI. While it would be useful to have access to more Exchange methods in UI Ruby scripts, this could act as a stop-gap or cover other use cases where a method ...