Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1338 of 1338

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 3 months ago in InfoWorks ICM / Results 2 For Review

Support SQLite / GeoPackage Data Formats in ODIC

It would be useful to import and export from structured, typed data in a container format - preferable SQLite and/or GeoPackage. The current import/export options are either untyped (e.g. CSV), require a database (Oracle, SQL Server), are SHP f...
Dave Watts about 1 month ago in InfoWorks WS Pro / Data Exchange 0 For Review

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest about 1 month ago in InfoDrainage / Reporting 2 For Review
107 VOTE

Support for multiple screens

Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Ann Pugh almost 6 years ago in InfoWorks ICM / Productivity 4 Will not implement

Slope in %

It would be very handy if the slope input option of % be present regardless of Regional settings; being just 1:x is an important limitation; also, if the slope in % could be shown in the section views, would be nice.
Guest 5 months ago in InfoDrainage / Hydraulics 0 For Review

Ability to conduct batch edits in CCTV inspection page

Currently, the user can make manual updates to CCTV inspections. However, in many cases they will want to edit inspections in batch. One common example is the Us/DS manholes do not match for hundreds (even thousands) of inspections. Rather than de...
Martha Nunez 8 months ago in Info360 Asset / Data Editing / Inspection & Media Management Workflows 0 Gathering support

Allow Exporting of Summary Data from Observed/Predicted Report with assessment made against wapug criteria in .csv format.

This would make reporting on model verification much quicker with higher accuracy
Roger Swan over 1 year ago in InfoWorks ICM / Export Data 13 Under consideration

Horizontal orifices as an outlet type

HydroCAD offers a horizontal orifice control outlet type that is very commonly used for detention pond outlet types in the US. Please include this as an outlet type so we can transition from HydroCAD to InfoDrainage.
Midori Patterson about 1 year ago in InfoDrainage / Hydraulics 1 Gathering support

Ability to move labels to avoid overlaps

At the moment if labels overlap the only way to read the information on screen is to reduce all text size, which has other readability issues.
Matthew Johnson 10 months ago in InfoDrainage / Visualization 0 For Review

Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson 10 months ago in InfoDrainage / Auditing / Reviewing 0 For Review