Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 22 of 1372

Add max pipe flow to the pipe properties window

Max pipe flow (theoretical pipe full) is not listed in pipe properties, as it was previously in MicroDrainage. It was a useful feature.
Ian George about 20 hours ago in InfoDrainage / Productivity 0 For Review

Results screen disappears when minimised

Minimising the results screen seems to cause the window to disappear and you cant maximise it again without rerunning the analysis
Ian George about 21 hours ago in InfoDrainage / Productivity 0 For Review

Improved catchment area import

Importing the catchment areas from cad is an extremely useful feature which would save hours of time, however, it does not work with all the areas and specifically not those with curved lines (most of the time). I think if infodrainage could impor...
Henry Wilkinson 3 months ago in InfoDrainage / Productivity 1 Under consideration

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest about 1 year ago in InfoDrainage / Productivity 1 For Review

Ability to look at multiple phases (surface and foul networks together) in 3D

Being able to view both surface and foul networks within MicroDrainage was always a very useful feature to visualise crossing points in the network and it doesn't look to have been included in InfoDrainage.
Henry Wilkinson 7 months ago in InfoDrainage / Productivity 1 For Review

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky 11 months ago in InfoDrainage / Productivity 0 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 7 months ago in InfoDrainage / Productivity 1 For Review

Graphical editing in Longsection

Being able to manually drag pipes up/down and alter their gradient in the long section graphics, was an extremely efficient workflow in Microdrainage, especially when using min. pipe design levels to dictate land-raise FGLs. Can this function be c...
Guest 9 months ago in InfoDrainage / Productivity 0 For Review

Manhole Types

Please allow us to specify manhole types (DMRB, SSG etc.) and covers and ensure that this data is visible in the manhole schedule export
Guest almost 2 years ago in InfoDrainage / Productivity 1 Gathering support

show upstream and downstream cover depth for connections

MicroDrainage used to show this its useful for checking cover to pipes are correct
Matt Hare about 1 year ago in InfoDrainage / Productivity 0 For Review