Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Risk Analysis

Deterioration Modelling should consider renewal date as part of the equation instead of just install date

In deterioration modelling, the key question is whether the model is predicting deterioration of the original asset or deterioration of the asset in its current post-renewal state. Install date only Using install date means asset age is simply: Ag...
Michelle Mcmillan about 5 hours ago in Info360 Asset / Asset Deterioration Modeling 0 For Review

Allow multiple filters to be used when creating risk models

When creating a new risk model, you can select one Asset Filter to apply to the analysis. Currently, the filter tool does not allow you to create filters that use both "And" and "Or" statements when building queries. This can greatly limit the fil...
Kim Solberg 10 days ago in Info360 Asset / Risk Analysis 1 For Review

Bulk update analyses button

It would be valuable to have a bulk re-run option to re-run all published analyses so that when a customer has done a data update they don't have to manually re-run each one.

Build your own expression for risk model total risk calculation

Specific request has come in from EPCOR. Requires follow-up As a user, I want to build my own expression when creating a risk model. For example, I want to bias the model myself and then normalize to 100. Total risk = ((LOF * 0.3) + (COF * 0.7)) *...
Mike Maylone about 3 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Multiparameter Risk Analysis 3 or more parameters

User wants to score pipes based on: 1- Proximity to a spatial layer. 2- Diameter 3. Depth And different combinations of each.
Martha Nunez over 1 year ago in Info360 Asset / Risk Analysis 0 Gathering support

Expanded use of the 'lining material' field

Pipes that are lined have to be updated in the GIS. Info360 Asset provides 'lining material' and 'lining type' fields. I think it would be beneficial to utilize this field in the risk analysis when assessing the 'pipe material' component to look a...
Martha Nunez over 2 years ago in Info360 Asset / Asset Deterioration Modeling 0 Gathering support

Provide a chart summary for risk models

Create risk summary charts akin to the inspection charts, showing range of risk ratings.
Brad Thompson over 3 years ago in Info360 Asset / Risk Configuration / Calculation 0 Under consideration

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg over 2 years ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

Add the Condition component option (from CCTV) as an option to be used under new categories.

This would be useful for users that want to have a separate category for one of the Condition fields (structural peak score, service score, etc). The reasoning is that we way that it is right now it forces the condition component to be depending o...
Martha Nunez about 5 years ago in Info360 Asset / COF & LOF Categories / Components / Risk Configuration / Calculation 0 Under consideration

Access real-time KPI's from Info360 for LOF's and Risk

For assets with sensors (e.g. pumps), time series KPI's can provide the best current point of truth on the condition of the asset.e.g. Analytics can report actual efficiency of pump performance so prioritization can be assigned for areas with grea...
Nathan Gerdts almost 6 years ago in Info360 Asset / COF & LOF Categories / Components 0 Gathering support