"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King about 1 month ago in InfoWater Pro / Other 1 Under consideration

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest 22 days ago in InfoDrainage / Productivity 0 For Review

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky about 1 month ago in InfoDrainage / Productivity 0 For Review

Add ability to see all pipes in Network Design Report

It is not possible to view the details / preliminary results of all the connections in the Network Design Report (each flow path needs to be selected in turn). This can be awkward for large networks.
Matthew Johnson 4 months ago in InfoDrainage / Auditing / Reviewing 0 For Review

Chezy Formula option

It would be useful to have a direct input for Chezy coefficient as an alternative to mannings n as some regions need to use this as an input and report on this too - this would result in less workaround and data manipulation
matthew.piggott 3 months ago in InfoDrainage / Hydraulics 0 For Review

Drag Labels in InfoDrainage Plan View

Text labels often end up overlapping and are illegible. It would be nice to be able to drag them like you can in CAD / Civil3D.
Midori Patterson about 1 year ago in InfoDrainage / Visualization 1 Gathering support

Changes to a network do not propagate downstream

If you change a pipe diameter or gradient, it will not accommodate these changes in the downstream section of the network. For example upsizing and steepening a pipe in the middle of a run will mean the next pipeis undersized and goes uphill. It a...
Matthew Johnson 4 months ago in InfoDrainage / Hydraulics 0 For Review

Open Control Center on Selection, Selection Set, or Domain

For models with lots of controls, this would be helpful to quickly look a few at a time. For example, all the controls at a specific site. Right now, the list appears to be sorted randomly. It would also be helpful to automatically sort alphabetic...
Colin Ricks 13 days ago in InfoWater Pro / Productivity 0 For Review

Batch run should work for run types other than standard

Batch run can only do standard runs. It is currently not possible to do fire flow, surge, pipe break, etc., as batch. Maybe add "Simulation type" to the General tab of the scenario explorer?
Colin Ricks 13 days ago in InfoWater Pro / Productivity 0 For Review

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 2 months ago in InfoWater Pro / Operational Modeling 1 Under consideration