Skip to Main Content
Autodesk
ADD A NEW IDEA

Productivity

Showing 132 of 1313

Better scenario comparison tools

Comparing changes/differences between scenarios is a chore as it can only be done via manually checking objects or looking through a text file showing the differences. I recommend 2 improvements. 1) be able to see different scenario attributes sid...
Andrew Sherson 1 day ago in InfoWorks ICM / Tree View 1 For Review

Allow grid view produced by a SQL script to interact with GeoPlan

Allow grid view produced by a SQL script to interact with GeoPlan so users can right click on SQL elements and zoom to/navigate to the selection on the GeoPlan.
Karen Chu 28 days ago in InfoWorks ICM / SQL 0 For Review

Process statistical reports from Ruby and ICM Exchange.

As part of DWMP running TSR "en masse" may be a requirement.We would like to code these in and export the statistical report results onc ethey are complete.This would save a great deal of time and would be processed in the background.There will be...
Jose Pereira 6 months ago in InfoWorks ICM / API / Exchange 1 Under consideration

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi about 1 month ago in InfoWorks ICM / Validation 0 For Review

2D meshing using Ruby and ICM Exchange

As part of DWMP we are likely to need to create multiple scenarios for each network based on Growth (2035, 2045 etc...). One of the approaches ot the detriment anaylsis will require a 2D approach. Would it be possible to allow meshing from within ...
Jose Pereira 6 months ago in InfoWorks ICM / API / Exchange 1 Under consideration
105 VOTE

Support for multiple screens

Would like to be able to work across multiple screens - plan view on one screen and long section/grid/graph on another.
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity 4 Will not implement

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul 6 months ago in InfoWorks ICM / Productivity 0 For Review

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest about 2 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Enable running stats templates via ruby script

We are running more and more simulations via ruby script but then have to manually run the stats reports, then export the results this is very time consuming. It would be very useful to be able to run the previously created stats templates from th...
Graham Millar over 1 year ago in InfoWorks ICM / API / Exchange 0 Gathering support

Remove Need to Validate When Changing Background Layers

Suggest that a network not need to validated or show that it was edited (red circle) for only switching on/off a background (e.g., aerial)layer would be appreciated. Keeping scenarios straight is tough enough w/out the additional heart attack when...
Guest over 3 years ago in InfoWorks ICM / Productivity / Validation 3 Will not implement