Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Improved scenario organization

Can we have the scenarios functionality improved to allow for scenarios to be organized into folders, ordered by various attributes (other than time of creation) and a search function within the scenario window. It would be useful to have the fold...
Guest about 3 years ago in InfoWorks WS Pro / Engine 3 In progress

Set gradient and/or pipe size of multiple parts within a single flow path in one operation.

In some instances we need to change the gradient or pipe size of an entire flow path. It would be helpful if this could be done in one operation rather than each part individually. Any branch connections could also update to align unless locked.
Guest about 2 years ago in InfoDrainage / Productivity 2 Will not implement

Global UPC Library

UPC (User Programmable Control) scripts currently come in two forms: Local UPC Scripts — attached to a single regulator (Pump Station or Valve), can only target that one object, and are easy to manage in isolation since they live on that object'...
Daniel Alexander about 2 months ago in InfoWorks WS Pro / Engine 0 For Review

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White almost 7 years ago in InfoWorks ICM / Productivity 4 Gathering support

Enable Workgroup products to perform a pivot calculation using SQL

Currently it is possible to perform an SQL query on 2 or more data fields e.g., SELECT SUM(length) AS "Pipe Length (m)" GROUP BY pipe_class AS "Pipe Class", user_text_9 AS "Pipe Size Category" This will produce a long list of grouped combinations ...
Tony Andrews about 1 year ago in Info360 Asset 1 Gathering support

Include pump HGL in simulation output

Standard output for InfoWater Pro includes hydraulic grade elevation for tanks and junctions. Since all pump design and performance information relates to hydraulic head (e.g., system curve, pump performance curve, etc.), in addition to (or in lie...
Michael Kane 9 months ago in InfoWater Pro / Productivity 0 Gathering support

Allow buildings to connect to multiple nodes with specified roof area percentages

In existing urban areas, especially during road reconstruction projects, we often face situations where only part of a roof can be disconnected from the foul system. Currently, in InfoWorks ICM, a building object can only be linked to a single nod...
Coen Maas about 1 year ago in InfoWorks ICM / Hydraulics 1 Gathering support

Amend & Simplify Report /Print Outputs

Would be useful to be able to fully customize the printed report outputs i.e. remove inlet, outlet information from controls, remove SuDS icons, remove unused or unimportant colums from results tables. It would also be good to be able to resize co...
David Williams almost 2 years ago in InfoDrainage / Reporting 2 Under consideration

Feature request for bulk delete of scenarios

I would like to request a feature that allows users to delete multiple scenarios at once within a single model network. After creating a base model in the model network, users often generate multiple scenarios to explore different countermeasures ...
Nami Ikarashi about 1 year ago in InfoWorks ICM / Scenario 8 Under consideration

Allow more elements to be included in Surge Group Graphs

Surge Group Graphs are limited to 40 elements (memory error if more), while Standard runs allow several hundred or more. Modern hardware should allow for a lot more than 40 elements in a graph.
Grant Clemens 9 months ago in InfoWater Pro / Productivity 0 On roadmap