simulation .elog file available via UI

Prior to ICM 2025, right clicking on the completed simulation > Open As would give access to the "simulation log", which contained useful details about the initialisation and failure reasons of the simulation. It would also contain diagnostics ...
Iain Scott 3 months ago in InfoWorks ICM / Results 1 Under consideration

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Add ability to use custom curve number tables other than the default TR-55

Many jurisdictions publish their own set of curve numbers for different land uses which they will expect to see during plan review. The local curve number sets often differ from TR-55. Please allow us to build custom curve number sets based on lan...
Guest 3 months ago in InfoDrainage / Hydrology 1 For Review

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden over 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Library of shared data across databases

As a large team with many databases, it is hard to manage a central set of SQL Queries, Themes, Inferences, Layer Lists, etc.We want a set of data like a Model Group that is shared among all databases in our cloud hub or workgroup server.
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Automated Data Exchange with InfoAsset Manager

If we think of asset management as divided into day-to-day work and organization (InfoAsset Manager) and long term, CIP planning work (Info360 Asset), this idea would bring asset management full circle. It'd also provide a huge workflow benefit fo...
Tim Medearis about 2 years ago in Info360 Asset / Integrations 3 Under consideration

Need for flexible rainfall assignment in 2D zones

In models created using ICM by Japanese users, it is not uncommon for both approaches—one where rainfall is applied to subcatchments and flood from the network flows over 2D elements, and another where rainfall is applied directly to the 2D zone—t...
Nami Ikarashi 3 months ago in InfoWorks ICM / InfoWorks 0 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 7 months ago in InfoDrainage / Productivity 1 For Review

Allow underdrains to have a different slope to the SuDS feature

Allow a storage structure such as dry swale, bioretention area or infiltration trench to have a different slope to the underdrain. Currently the underdrain has to follow the slope of the feature, which is not a real life representation of how they...
Oliver Dodd about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Graph RTC variables

RTC variables can be useful when modelling complex systems, but while I can check individual timestep values of variables using the log, it would be helpful to be able to visualize these on a graph (and compare it with other simulation results).
Iain Scott 7 months ago in InfoWorks ICM / Results 3 Gathering support