Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest over 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Perforated Pipe as Connection Type

I would like to be able to model a perforated pipe as a connection type rather than use an infiltration trench and short branches of pipes to connect them to other stormwater controls. These infiltration trenches are not collecting inflow from sur...
Midori Patterson over 1 year ago in InfoDrainage / Hydraulics 1 Gathering support

Provide InfoWater Pro integration with Civil 3D

Engineers and designers using Civil 3D for water distribution system design need to be able to verify the hydraulic adequacy of their designs quickly and efficiently in InfoWater Pro. There is currently no means by which to exchange Pressure Netwo...
Michael Kane over 1 year ago in InfoWater Pro / Data Exchange 1 Under consideration

Validation as a background task

Validation as a background task so UI isn't locked.
Guest almost 6 years ago in InfoWorks ICM / Productivity / Validation 2 Will not implement

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews about 1 year ago in Info360 Asset 0 Gathering support

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh almost 6 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Manhole Types

Please allow us to specify manhole types (DMRB, SSG etc.) and covers and ensure that this data is visible in the manhole schedule export
Guest over 1 year ago in InfoDrainage / Productivity 1 Gathering support

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez over 1 year ago in Info360 Asset / Rehab actions & cost 0 Under consideration

"Initially Closed" and "Check Valve Direction" symbology should adhere to the "show inactive elements" toggle

This is simple enough to do by adding a definition query on the MOTYPE field in conjunction with the existing DSPCODE filter, but currently I would have to manually change this for 4 layers every time I toggle display of inactive elements.
Eric King 6 months ago in InfoWater Pro / Other 1 In progress

Rehab Action Filter Options for Results need expanded

When querying a Rehab Action in the Results table, we only have the Operator option of 'is any of'. Looking to have the opposite available, something like 'is not equal too'. We are having to select many values to set the filter = where if we have...
Todd Plank 5 months ago in Info360 Asset / Query types / Capabilities 2 Under consideration