Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1338 of 1338

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest 10 months ago in InfoDrainage / Hydraulics 0 For Review

Status Transfer for Critical Channels in Info360 Plant

To enable Info360 Plant to transfer a "status" for channels, allowing users to establish when a critical channel is missing data. Current Situation: Info360 Plant currently has value mapping capabilities, but there are limitations: Setting the val...
Javier Coronado 4 months ago in Info360 Plant / Admin / Global Changes 0 For Review

Create a stormwater system type

It would be useful to be able to manage stormwater networks separately from sewer
Brad Thompson about 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 In progress

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 7 months ago in InfoWater Pro / Operational Modeling 1 Under consideration

Time series results for thematic maps

In the current state you need to add simulation results to a model and then preform a SQL to add a TSR result to a userfield. It would be easier to just add TSR results to the thematic SQL options.
Farhan Meke about 1 year ago in InfoWorks ICM / Theme 3 Under consideration

Right click menu on objects to graph, trace, edit, etc. Similar to ICM

I want to interact with my model primarily from the map rather than relying on toolbars. Namely, I want to select an object and then access an action menu to graph, edit, trace, label, etc on that object. Note: ICM already supports this feature, s...
Nathan Gerdts 3 months ago in InfoWorks WS Pro / Productivity 0 For Review

Optimise Head / Discharge curves automatically for simulations

When simulating models, it is often necessary to consolidate the values in a H/Q curve to retain the hydraulic performance but optimize the simulation speed. As during previous correspondence with the InfoWorks support team, this has been advised ...
Tom Walker about 1 year ago in InfoWorks ICM / Orifice 2 Gathering support

Allow no delay connections with a free flow outlet option instead of automatic orifice nodes.

Currently when flows from a pipe with a free outlet node is diverted to a different location via a no delay connection, the free flow outlet automatically changes into an orifice, which in fact does not exits there. This orifice also needs a manua...
Iwona Savas 6 months ago in InfoDrainage 0 For Review

Change the way scenarios work

When scenarios were first introduced the way they were implemented didn't seem intuitive. With increasing interest in such as adaptive pathways the number of scenarios can rapidly increase because each scenario is its own network. This proposal is...
andy.bolden about 2 years ago in InfoWorks ICM / Scenario 0 Gathering support

Amend & Simplify Report /Print Outputs

Would be useful to be able to fully customize the printed report outputs i.e. remove inlet, outlet information from controls, remove SuDS icons, remove unused or unimportant colums from results tables. It would also be good to be able to resize co...
David Williams 8 months ago in InfoDrainage / Reporting 0 For Review