Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 126

Costs that vary based on different parameters (Material, size, buried depth, etc)

Costs vary based on different parameters as it is not the same to replace a 6in pipe vs a 12 in pipe. Pipes that are buried deeper are also more expensive.
Martha Nunez over 1 year ago in Info360 Asset / Rehab actions & cost 0 Under consideration

upgrade the embedded Ruby interpreter

It is a pity that there is no way to upgrade the embedded Ruby interpreter. Unfortunately, that old version is not compatible with many of the useful Ruby Gems – severely limiting its usefulness. Do you have plans to include a more recent version ...
Guest 5 months ago in InfoWorks ICM / API / Exchange 2 Under consideration

IWLive - alernative warning themes for polygons

Currently IWLive polygons can theme based on the most severe warning. We want an option to theme instead based on which polygon contains the most warnings, and potentially other options like the earliest warning.
Nathan Gerdts over 1 year ago in InfoWorks WS Pro 0 Under consideration

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Change default field name behaviour when exporting to shape file

When exporting model network data to shapefile format, the default export field names generated in the “open data export centre” are currently very awkward. The issue arises because many field names in ICM are longer than ten characters, but shape...
Jason Kulsdom 10 months ago in InfoWorks ICM / Export Data 2 Under consideration

Count of inspections query in rehab tree

Count the number of inspections in a pipe. This is a query in IAP that might be utilized to check if a pipe has had an inspection reversal or simply to check how many inspections have been conducted in a pipe.
Martha Nunez 7 months ago in Info360 Asset 1 Under consideration

Time series results for thematic maps

In the current state you need to add simulation results to a model and then preform a SQL to add a TSR result to a userfield. It would be easier to just add TSR results to the thematic SQL options.
Farhan Meke 12 months ago in InfoWorks ICM / Theme 3 Under consideration

VSP Control based on Tank Head/Level

Currently you can only use Junction Pressure setpoints or Pump Flow setpoints in the VSP Control dialogue. It would be helpful to be able to use a Tank Level/Head setpoint to adjust the pump speed as well. This is possible in competitor products l...
Grant Clemens about 2 years ago in InfoWater Pro / Operational Modeling 3 Under consideration

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner over 1 year ago in InfoDrainage / Civil3D Integration 1 Under consideration

Modify Peaking Constant/Shape Factor in SCS Routing Model

There isn't a good way to modify the peaking constant also referred to at the shape factor for developing an SCS hydrograph in ICM networks. The most common is 484 which is the constant used in an ICM network, but there are occasional needs to mod...
Ryan Brown about 1 year ago in InfoWorks ICM / Hydrology 5 Under consideration