Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1170 of 1170

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh about 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Simplfy Downloading results

While running lots of models on the cloud - I need to process them in GIS (cause Clip meshing doesn allow me to compare these models), dowloading 21 simulations is a single-click action considering. Make the process easier.
Matt Anderson 5 months ago in InfoWorks ICM / Info360 Cloud 2 Gathering support

3D View of flooded manholes

The extent of flooding in the 3D view should be proportional to the volume of flooding of that manhole. At the moment it shows the same extent of flooding whether it's 0.1m3 or 100m3. Would make visualisation the extent and location of flooding on...
Guest 5 months ago in InfoDrainage / Visualization 1 Already exists

Deterioration Modeling - Statistical

Predict asset failure using statistical deterioration curves and customer data (unique or global). We could use the existing model library from the IAP desktop and implement Herz and Weibull curves to start. Especially valuable for water customers...
Mike Maylone about 2 years ago in Info360 Asset / Asset Deterioration Modeling 2 In progress

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Guest almost 5 years ago in InfoWorks ICM / Productivity 3 Gathering support

Add summary statistic results for MSX outputs

I want to view Min, Max, and Avg statistics for my MSX results directly on the map so that I can summarize results spatially. Currently MSX results provide time-varying results for mapping of each species, but not the summary statistics across the...
Nathan Gerdts 6 months ago in InfoWater Pro / Water Quality 0 Gathering support

It will great if we can control the display of the labels in ICM to have a better visualization.

For example : the possiblity of changing the precision in the labels (the decimal number of the value )
Guest over 2 years ago in InfoWorks ICM / Visualization 2 Gathering support

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer 5 months ago in InfoDrainage / Hydrology 1 For Review

Export GeoTiff

Export Maximum flood contours should allow export to modern GeoTIFF formats rather than expensive ASC formats
Matt Anderson 5 months ago in InfoWorks ICM / Productivity 0 For Review

Add US and DS HGLs for links

Currently ICM link results report the US and DS total head values. As a user, I'd like to see the HGL at the US and DS locations consistent with the node results. This would be useful on graphs and long sections.
Guest over 1 year ago in InfoWorks ICM / Long Section / Profile 0 Gathering support