Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 558 of 1423

Increase RTC Comment Length and Configuration

Currently RTC Comments are limited to 69 characters and only appear within a single box that you need to scroll horizontally to read. Please allow comments to be much larger and have multi-line format so we can add useful comments and explanations...
Dave White over 1 year ago in InfoWorks ICM / RTC 1 Under consideration

RTC Naming

Allow longer names for RTC definitions (Rules, Logic, Variables, etc.). Current limitation of 10 characters for a name is debilitating for more complex logic trees (especially in Global) and does not permit easily named element descriptors.
Dave White over 1 year ago in InfoWorks ICM / RTC 1 Under consideration

Remember/Fix Toolbar positions

When moving window from fullscreen to half/split-screen all the toolbars are moved to fit half screen width. When returning to fullscreen the toolbars remain in their split-screen positions. This makes finding tools challenging, takes up more scre...
Matthew Paul over 1 year ago in InfoWorks ICM / Productivity 1 Under consideration

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest almost 3 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest almost 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Adding Copy&Paste functionalities to the ICM UPM tool outputs

We would like to be able to easily copy paste the summarised results given by the UPM tool. We currently have to manually copy these results into excel which is prone to human error.
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis.

Updating the water quality UPM tool to be compliant with the 3rd edition of the UPM manual for Level 1 water quality analysis. This includes: Removing the dependency of exceedances in a river on spill duration. This would provide a more robust app...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Time series results for thematic maps

In the current state you need to add simulation results to a model and then preform a SQL to add a TSR result to a userfield. It would be easier to just add TSR results to the thematic SQL options.
Farhan Meke over 1 year ago in InfoWorks ICM / Theme 3 Under consideration

More tools for geometry manipulation

When building networks with multiple similar sections, it would be incredibly useful to have more tools for manipulating the geometry of selected objects, primarily a rotation tool and an invert/flip tool (e.g. swap the orientation of the nodes ei...
Guest 7 months ago in InfoWorks ICM / InfoWorks 1 Gathering support