Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Cancel graphs early

Add the ability to cancel out of loading a graph of observed vs predicted if it is taking too long. Particularly a problem with large run results or large observed datasets such as SCADA raw data. Can freeze the software for a very, very long time...
Guest about 1 year ago in InfoWorks ICM / Calibration 2 Gathering support

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest about 5 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

dark mode

for people that are spending a big amount of time in ICM, a dark mode would be ideal, don't know why this hasn't been implemented yet, since most of the apps have this option and there isn't really any option to change the appearence colours in th...
Ionut Pintea almost 3 years ago in InfoWorks ICM / Visualization 2 Gathering support

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker over 3 years ago in InfoWorks ICM / Simulations 2 Gathering support

In-sewer water temperature model

In-sewer water temperature monitoring has been around for a while. It is useful for identifying groundwater infiltration, potential heat recovery locations, optimising chemical dosing, predicting H2S build up and other key sewer processes. A dynam...
John Ward over 1 year ago in InfoWorks ICM / Simulations 4 Under consideration

Adding Level 2 water quality capabilities to the ICM UPM tool

The current UPM tool only allows for completion of level 1 water quality impact assessments. We believe that our assessments would benefit greatly by having the additional functionality to complete level 2 water quality impact assessments. This me...
Guest about 3 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Increasing speed of UPM water quality tool

As part of SOAF, we are required to run CSO water quality analyses using 10-year simulations. Using these outputs in the UPM tool often takes a long time. Whilst the tool is running, the modeller cannot use ICM for completing other tasks. We have ...
Guest about 3 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Import data into GeoPackage format

The GeoPackage format is gradually replacing Shapefile in the vector data of the IGN (French National Institute of Geographic and Forest Information): article dated 20 January 2025 from the IGN Already available for BD CARTO® and BD TOPO®, the Geo...
Armonie COSSALTER 10 months ago in InfoWorks ICM / Import data 2 Gathering support

Update Flow Survey Importer

Please update the Flow Survey Importer function within InfoWorks ICM. This part of the software is straight out of HydroWorks and contributes to RSI (repetitive strain injury) for users. As to import a flow survey it requires clicking on each moni...
Tom Walker 5 months ago in InfoWorks ICM / Import data 0 For Review

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake about 6 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support