Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 544 of 1370

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 3 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Bank line ground model update from within properties view

Make update from ground model possible from within properties view (as is already possible for cross sections)
Guest almost 3 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Add a "Pan to Selection" option in GeoPlan window

Just what the above says. The zoom in/out can be pretty touchy, particularly on track pad. While "zoom to selection" helps, if you're just trying to zoom to a single node or short link, it zooms in too close to be particularly helpful when looking...
Jacob Eck over 1 year ago in InfoWorks ICM / Visualization 1 Gathering support

Export functionality for SWMM objects in database tree

Be able to right-click on SWMM objects (SWMM time patterns, SWMM climatology, SWMM pollutograph) and export to CSV as you can with InfoWorks objects.
Guest 8 months ago in InfoWorks ICM / Export Data 1 For Review

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest over 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

reduce validation time of models with infiltration zones

When using rainfall onto mesh in InfoWorks ICM, we often rely on infiltration zones to represent different land uses and their runoff characteristics (e.g., impermeable surfaces, grass, etc.). To ensure full coverage and avoid gaps or "donuts" in ...
Coen Maas 4 months ago in InfoWorks ICM / Validation 2 For Review

Pop out windows for tabs

This would be useful so then one would be able to view multiple long-sections and view the map at the same time on different screens, rather than being limited to one tab at a time.
Guest 4 months ago in InfoWorks ICM / Visualization 1 For Review

RTC Naming

Allow longer names for RTC definitions (Rules, Logic, Variables, etc.). Current limitation of 10 characters for a name is debilitating for more complex logic trees (especially in Global) and does not permit easily named element descriptors.
Dave White about 1 year ago in InfoWorks ICM / RTC 1 Under consideration

dark mode

for people that are spending a big amount of time in ICM, a dark mode would be ideal, don't know why this hasn't been implemented yet, since most of the apps have this option and there isn't really any option to change the appearence colours in th...
Ionut Pintea about 2 years ago in InfoWorks ICM / Visualization 2 Gathering support

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang 7 months ago in InfoWorks ICM / Hydraulics 2 Will not implement