Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Automatic Syncing for Civil3D Catchments and Infodrainage

We have been making catchments in Civil3D first and then exporting to Infodrainage. But if the catchments ever need to change , we have to change both the Civil3D catchment that houses our drainage area maps and the infodrainage inflow area. It wo...
Jenna Woyner over 2 years ago in InfoDrainage / Civil3D Integration 1 In progress

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest over 1 year ago in InfoWater Pro / Operational Modeling 2 Under consideration

Run same return period with multiple climate change allowances

When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the netwo...
Guest almost 4 years ago in InfoDrainage 1 Already exists

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest about 3 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng about 2 years ago in InfoWorks ICM / Reporting 0 Gathering support

PACP v8 Compliance for InfoAsset Manager and Info360 Asset

Version 8 was released in early 2024. It includes pressure pipe assessment codes. This grading system would be a significant improvement to the PACP7 compliance which, while still popular, is 7 years old. NASSCO has sunset version 6, and no longer...
Tim Medearis over 2 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 2 Gathering support

More flexibility for pdm runs

We would like to be able to simulate warmup and hydraulic simulations with different input sources. Now the run crashes if for example rainfall data does not match the saved state of the warmup run. It would also be very useful to make it possible...
Guest over 3 years ago in InfoWorks ICM / Hydrology 0 Gathering support

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest over 3 years ago in InfoWorks ICM / Simulations 0 Gathering support

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez over 1 year ago in Info360 Asset 1 Gathering support

Junction Loss

There need to be more options for calculating junction loss. Having values for entry and exit loss isn't enough. Recommend HEC-22 and AASHTO at a minimum.
Guest about 2 years ago in InfoDrainage / Hydraulics 2 Gathering support