Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer over 1 year ago in InfoDrainage / Hydrology 2 For Review

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest over 4 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Show preliminary sizing estimated flow depth in profile view.

The proportional depth is given in the Network Design Report but not shown in the long sections. This is a very useful feature to allow quick checking of throttling or spare capacity in the network.
Matthew Johnson about 1 year ago in InfoDrainage / Hydraulics 0 For Review

True Ground Profile on Long Section Exports

It would be very useful if there was a way for the true ground profile to also be exported on long sections. Currently, when exporting long sections from microdrainage, the true ground levels are only shown at manhole locations and a straight line...
Guest about 3 years ago in InfoDrainage 2 Already exists

Manhole Schedule Numbering

For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30. I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deep...
Guest about 3 years ago in InfoDrainage 3 Already exists

Export manager scope should include Selection Sets

Export manager "Element Scope" currently only allows All, Domain, and User selection for the scope of the elements to export. A combo box with the list of selection sets would be useful and likely easy to implement.
Colin Ricks over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Ability to update and/or overwrite a spatial layer

Currently the user needs to delete the layer and re-import a new one. There should be an 'update' uption for all spatial layers.
Martha Nunez about 2 years ago in Info360 Asset / Asset / Spatial Data Import 0 Gathering support

Skeletonize water distribution asset network to simplify asset risk and rehab modeling

Don't want to do risk/rehab on all mains. Would like to aggregate / combine assets based on a set criteria and perform risk and rehab on those combined asset classes. Filter management does not quite work ATM.
Tony Andrews 11 months ago in Info360 Asset 0 Gathering support

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker over 1 year ago in InfoWorks ICM / Results 2 Already exists