Skip to Main Content
Autodesk
Status For Review
Product InfoDrainage
Categories Hydraulics
Created by Guest
Created on Oct 4, 2024

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liquid height is 150mm lower from manhole cover) at starting manhole. i came to know from your supporting team that Infodrainage software will not support this analysis as of now. can you please look in to it. Liquid filled drainage system is most requirement in petrochemical industry on the safety requirement.

  • Attach files