Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1228 of 1228

Backwards Compatibility with Versions

Backwards Compatibility between updates. Sometimes not everyone is working on the same version of Infrodrainage, I get why this is in place but would be helpful if this was in place somehow, like all of 2024 could work together rather than specifi...
Guest over 1 year ago in InfoDrainage 1 Under consideration

Model results as TVD connectors

We'd like to have model results as an input in the TVD connectors. An example is where we have observed flows that we would like to use at a tributary and then switch to catchment flows when the observations run out. We know this can be done using...
Richard Body over 4 years ago in InfoWorks ICM / Calibration / Results / Sharing / Time Series DB 0 Gathering support

Sort Manhole Schedules in Numerical Order

Hello, It should be possible to sort Manhole Schedules in Numerical Order - currently the randomness has lead to many questions & queries from site which has a risk for setting out/construction errors. It should also be possible to add MH type...
Guest 6 months ago in InfoDrainage / Reporting 0 For Review

Create Ruby script syntax from ODIC/ODIC interface

The idea is to have a method available on InfoWorks ICM, InfoWorks WS Pro and InfoAsset Manager ODIC/ODEC interface that will create the equivalent Ruby syntax comprising all of the required parameters for the ODIC/ODEC methods. The Ruby script co...
Tony Andrews 11 months ago in InfoWorks ICM / API / Exchange / Data Exchange 1 Gathering support

Additional video file type uploads

Clients are asking for the ability to upload .insv and .360 files types.
Sam Cannata 3 months ago in Info360 Asset / Import / Upload 0 Gathering support

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts 6 months ago in InfoWorks WS Pro / Operations 0 Gathering support

Manhole Schedule Numbering

For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30. I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deep...
Guest over 2 years ago in InfoDrainage 3 Already exists

InfoDrainage - level bench in basin/pond configuration

The sizing calculator in the pond build pop-up enables one side lpe only. There are now LLFAs that require level benck of at aleast 1.5 m width after 0.6 m depth in a basin. It is currently not possible to use your calculator to establish such bas...
Guest over 2 years ago in InfoDrainage 2 Gathering support

I want a Gully Space calculations tool in InfoDrainage

InfoDrainage - want to do Gully space calculations or assess capacity of different gullies. can you add the gully design tool to InfoDrainage?
Guest over 2 years ago in InfoDrainage 1 Under consideration

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner 12 months ago in InfoDrainage / Other 2 Will not implement