Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1423 of 1423

Include parts mapping files for the UKIE country kit by default.

Across the UKIE region many designers will use the UKIE country kit for building Civil3D models, instead of everyone making their own parts map files this could be an integral part of the data exchange between two Autodesk products, included in th...
Guest about 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

Change default field name behaviour when exporting to shape file

When exporting model network data to shapefile format, the default export field names generated in the “open data export centre” are currently very awkward. The issue arises because many field names in ICM are longer than ten characters, but shape...
Jason Kulsdom over 1 year ago in InfoWorks ICM / Export Data 2 Under consideration

Allow export of user flags via ruby

As a WaSC we hold our models in a central model library and need to ensure our default flags are utilised, and the descriptors are not amended. we have automated the comparison as far as possible but the flags within any new Db have to be manually...
Richard Robinson about 1 year ago in InfoWorks ICM / Export Data 0 For Review

Better Interoperability options

The InfoDrainage import tool in Civil 3D forces all model elements (Pipe Networks and SWC Surfaces/Featurelines/Corridors) into a single active drawing. This conflicts with standard Civil 3D workflows where Utility and Grading designs are maintain...
Guest 3 months ago in InfoDrainage / Civil3D Integration 1 Under consideration

To use the results from one rehab tree as a query in another rehab tree

There is a need to be able to query if a pipe has been flagged for a rehab action in one rehab tree so it can be excluded in a second rehab tree
Michelle Mcmillan 3 months ago in Info360 Asset 0 For Review

Capability to model water distribution network in ICM

Can the function of “ForceMain” in InfoWorks ICM be expanded so that ICM can model the water distribution network. Or the InfoWorks WS function be included in ICM. This is often a requirement when the recycled network and sewer network are to be m...
XJ Wang 10 months ago in InfoWorks ICM / Hydraulics 2 Will not implement

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest about 1 year ago in InfoDrainage / Data Exchange 0 For Review

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Histograms

The first step toward industrial optimization is establishing a baseline performance. In plants, histograms visualize historical performance statically. The shape of KPI histograms allows quickly establishing operation performance, i.e. high varia...
Javier Coronado about 1 year ago in Info360 Insight / Data 0 For Review

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support