Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1370 of 1370

Status Transfer for Critical Channels in Info360 Plant

To enable Info360 Plant to transfer a "status" for channels, allowing users to establish when a critical channel is missing data. Current Situation: Info360 Plant currently has value mapping capabilities, but there are limitations: Setting the val...
Javier Coronado 9 months ago in Info360 Insight / Admin / Global Changes 0 For Review

Possibility to turn off report windows

Now, when updating elements from ground model, extending cross sections, inserting an opening in a bridge… a report is displayed. This can be very annoying when building up a model and you have to click the report windows away. It would be useful ...
Guest almost 3 years ago in InfoWorks ICM / Mesh / Productivity 2 Gathering support

Include regulator state in graph reports

this can only be done with custom graphs, would be easier in standard graphs for run comparison
Guest almost 3 years ago in InfoWorks ICM / Results 0 Gathering support

Allow for the running of statistics templates and generation of grid reports such as RPA and worst case using ICM Exchange

No description provided
Guest over 5 years ago in InfoWorks ICM / API / Exchange / Productivity / Results 0 Gathering support

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford almost 2 years ago in InfoWorks ICM / Results 2 Gathering support

Hydrant Available vs. Hydrant Design

Has anyone had issues with the hydrant available flow being less than the hydrant design flow? It has always been my impression that the hydrant available flow has less constraints and therefore would have a higher fire flow than that of the hydra...
Guest about 1 year ago in InfoWater Pro / Automation 1 For Review

Retain company logo in Hard Copy Headings

Company logo/attached image currently disappears from Hard Copy Headings after closing and reopening InfoDrainage. Other headings are retained. The image should also be retained when the file is reopened.
Daniel'le DeVoss over 1 year ago in InfoDrainage / Reporting 2 Gathering support

Capability to restore multiple pruned links

It is cumbersome to restore pruned links one at a time if many assets need to be restored. The ability to restore a selection of pruned links and/or all pruned links would be helpful.
Guest over 1 year ago in InfoWorks ICM / Network 2 Gathering support

Resolving import errors for level events containing non-ASCII characters

When importing a generic CSV file containing non-ASCII characters (such as Japanese) as level events, double quotation marks ("") are added to the profile name. As a result, it no longer matches the outfall node ID, and the level is not applied co...
Yota Machii 6 months ago in InfoWorks ICM / Import data 1 Already exists

Pump Station Operation Narrative

Would like the ability to add a pump station narrative. For example, a station may have several pumps and varying set points, however those set points do not relate to a specific pump. The station may operate where once the first set point is reac...
Dave White about 1 year ago in InfoWorks ICM / Pumps 0 For Review