Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1423 of 1423

Enable Exchange Ruby method for carrying out spatial analysis in Workgroup Products

SQL tool in InfoAsset Manager enables users to perform spatial analysis of a variety of types using a selection of layer types. This is an extremely important and useful analytics tool which avoids the need for a user to export data out of InfoAss...
Anthony Andrews 5 months ago in Other Product Ideas / Other 1 For Review

Sort and collapse all option in flowpath Network Design Report

It would be useful to be able to ‘collapse all’ for branches in the Network Design Report. It would also be useful to be able to sort the connections (and junctions) in order of upstream→downstream or alpha/numeric. At the moment it seems rather a...
Matthew Johnson over 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 10 months ago in InfoDrainage / Productivity 1 For Review

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner about 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

make easier the result analysis

make easier the result analysis, by editing the results (e.g volume in en pipe) at a given timestep (e.g. daily, hourly...)
Christophe LECLERC 2 months ago in InfoWorks ICM / Statistics 0 For Review

Parcel Import to Catchment

It would be extremely helpful if InfoDrainage could import Civil 3D Parcels directly as catchment areas, similar to how it currently imports other CAD data (polylines). Parcels often represent drainage catchments, lots, or contributing areas in si...
Guest 5 months ago in InfoDrainage / Data Exchange 1 Gathering support

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake over 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest over 2 years ago in InfoWorks ICM / Calibration 0 Gathering support