Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Pump and Valve symbol that indicates direction

The default symbols for Pumps and Valves should ideally indicate the direction they're pointing. This should involve dynamic symbol rotation based on connected pipes (not results). That way I can visually validate my data before running the model....
Nathan Gerdts about 1 year ago in InfoWater Pro / Productivity 0 In progress

Option to remove the additional storage automatically added in geocellular systems

When designing a cellular soakaway, infodrainage automatically assumes a 1m2 plan area chamber between tank soffit and exceedance level (which would have been specified as ground level). In other structures you can specify freeboard and exceedance...
Guest about 2 years ago in InfoDrainage / Hydraulics 3 For Review

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest over 3 years ago in InfoWorks ICM / Calibration 0 Gathering support

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky almost 2 years ago in InfoDrainage / Productivity 0 For Review

Allow two Infodrainage files to be combined

Request for a paste, copy, cut branch to file options, to allow two Infodrainage files to be combined. As the available in Microdrainage
Guest over 2 years ago in InfoDrainage / Other 2 Under consideration

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 2 years ago in Info360 Asset / Product workflows 1 On roadmap

Themes to include robust SQLs

Can we enhance conduit theming using robust SQL queries? We're aiming to apply themes based on the mean of minimum upstream and downstream velocities in each conduit over the TSR simulation. Considering the multiple scenarios involved in system de...
Parameswara Rao Narra over 1 year ago in InfoWorks ICM / Theme 4 Already exists

worst case Grid report to include min values

Can the worst case grid report be enhanced to include minimum values for velocity and flow, similar to how it currently reports maximum upstream and downstream flow? This addition would be highly beneficial for understanding hydraulic behavior dur...
Parameswara Rao Narra over 1 year ago in InfoWorks ICM / Results 3 Already exists

Ability to change flow path in the profile view

It would be very convenient to be able to select a different flow path from within the long section (profile) view.
Matthew Johnson about 2 years ago in InfoDrainage / Auditing / Reviewing 0 For Review

Colour coding of connections and junctions

Can the functionality of colour coding pipes (by depth, diameter, flood status or user-choice) be added. This is very useful for checking models or recording changes, pipe condition, ownership etc.
Matthew Johnson about 2 years ago in InfoDrainage / Visualization 0 For Review