Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1369 of 1369

Add a new Special Query for "Demand Junctions" in the Domain Manager

Currently you have to either make your own tediously long query, or you can run a simulation and use output filters, but it should exist as a built-in Special Query.
Grant Clemens over 1 year ago in InfoWater Pro / Productivity 1 Gathering support

Make Themes sharable between network types

An external IWS file stores a Network type, however, there are uniform Theming that can or should be shared - like Ground Models. Themes needs an overhall to share across models so we dont need to recreate the wheel or edit XML files to get things...
Guest about 2 years ago in InfoWorks ICM / Network 1 Gathering support

Antecedent conditions as a direct run input for design events

I would like an object similar to the 'Catchment Initial Conditions' object for the TSB, that would allow a user to directly specify and overwrite the initial NAPI value, soil store level and groundwater level, per each individual subcatchment, in...
Guest 9 months ago in InfoWorks ICM / Rainfall 0 For Review

2D worst case analysis

I would like to be able to analyse a number of simulations in terms of the worst flood depth per 2D mesh element. An integrated tool (along the lines of the already existing worst case grid output) would avoid the need to mess around in external GIS.
Iain Scott almost 5 years ago in InfoWorks ICM / 2D Flooding / Hydrology / Productivity 1 Gathering support

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 7 months ago in InfoDrainage / Reporting 0 For Review

Add an option to 'apply rainfall' directly to river reach objects

Currently a user would need to define a subcatchment to generate runoff for a river reach. This is okay for 1D models but for 1D/2D models, especially 2d runoff models it adds some additional steps for the user. It would be nice for add a 'apply r...
Alex Grist 7 months ago in InfoWorks ICM / River Modeling 2 Under consideration

Sewer Design - Area Density Method

Area Density method is recommended to be incorporated in Infodrainage as it offers improved accuracy and aligns with Indian flow calculation standards which could enhance the reliability of the outputs. This method is described in Indian Guideline...
matthew.piggott 7 months ago in InfoDrainage / Other 1 For Review

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest 12 months ago in InfoWater Pro / Operational Modeling 1 Under consideration

Add support for nodes in Infoworks ICM "custom graph observed/predicted report" to compare water level

I would like to compare predicted(sim) and observed values at nodes for level. Currently the report only supports links, and the closest thing is the pipe depth at the node.
Mel Meng over 1 year ago in InfoWorks ICM / Reporting 0 Gathering support