Skip to Main Content
Autodesk
ADD A NEW IDEA

Simulations

Showing 84 of 1334

Partially complete a simulation and review results and then opt to continue the simulation

Simulations often take a long time to run. I would like to be able to "pause" the simulation and review the results to check that the initialisation is correct, or that an RTC is working properly, and if I am happy then continue the simulation to ...
Ann Pugh over 5 years ago in InfoWorks ICM / Productivity / Reporting / Results / Simulations 2 Under consideration

Pause simulations during server restarts

Please could we have an ability to auto-pause simulations whilst an InfoWorks ICM server is restarted? As part of the wider drive to reduce CSO spills there is an increasing need to run long time series through sewer models. This can require model...
Tom Walker over 2 years ago in InfoWorks ICM / Simulations 2 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body over 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest over 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Zoom graphs on either axis

Many software suites allow the option to zoom in on both y and x axes on their graphs. However, ICM only allows zooming on the x-axis which often takes away the ability to see trends for lower or higher conditions. I am aware that it is possible t...
Guest almost 4 years ago in InfoWorks ICM / Calibration / Productivity / Results 4 Gathering support

Export run results to csv: timestep options

When exporting run results to csv, it would be useful to select a timeframe you wish to export (excluding for instance the initial conditions that haven't settled into a level that makes sense). Also exporting at a different timestep than the one ...
Guest over 2 years ago in InfoWorks ICM / Export Data / Results 0 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest over 5 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake about 5 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Results management - be able to see the size of sim results before they are downloaded from the cloud

It would offer additional, useful functionality if the user could see the size (MB/GB) of results files BEFORE downloading them locally. This could be shown via the log file, PRN, Results management, simulation properties, or all of the above. Any...
Saul Bradford over 1 year ago in InfoWorks ICM / Results 2 Gathering support

Better functionality for multiruns

- number episodes in episode collection - sort runs according to number - greater timesteps for runoff only runs - resume with next run if a run fails - easy export of maximum results of runs (without results of the runoff only runs)
Guest over 2 years ago in InfoWorks ICM / Simulations 0 Gathering support