Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

Showing 544 of 1370

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

WBNM Hydrology Method in ICM

Australian flood modelling user have requested access to the WBNM hydrology method inside InfoWorks ICM. WBNM is one of the endorsed methods in Australian Rainfall & Runoff and large numbers of historical studies use this method.
Guest over 5 years ago in InfoWorks ICM / Rainfall 0 Gathering support

Include a Rainfall Generator Using Environment Canada Data

Similar to the ARR and NOAA 14 storm generators, build one that could utilize Environment Canada data with common distribution types.
Guest about 4 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Allow all objects (nodes, subcatchments etc) to be included within the ‘gauge’ objects used in the run window

In a simulation run window the user has the choice to use a selection list of 'gauged' objects. This is useful so as to provide the results of some objects more frequently, or to only save the results from some objects and not others, in order to ...
Lizzie about 4 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Show water levels at Bridge Linear Structures

We would like to see the water levels at the bridge linear structures as it is important for us to be able to see the water levels with respect to the bridge openings and decks.
Richard Body almost 5 years ago in InfoWorks ICM / Bridge / Hydraulics / Results 0 Gathering support

Validation of Bridge data

When a model is validated, it doesn't pick up on problems with bridges, that prevent the model from running. For example, the error "bed section is above soffit" is given when trying to run the model, but does not appear in the validation messages...
Guest almost 5 years ago in InfoWorks ICM / Bridge / River Modeling / Validation 0 Gathering support

snap river reach lines to cross sections

When creating river reach links the vertices should snap to cross sections so that vertices are only created on the cross-section lines (if vertices are to close on river reach objects you get meshing problems later on!) and is easier to follow th...
Guest about 2 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Initial condition 1D setting value

For Initial Conditions 1D, InfoWorks ICM seems to specify 1) initial level(m AD) and inflow values at nodes for Nodes grid, 2) and initial depth (m) and flow values along the river reach for River Reaches grid. For river reaches grid, as an initia...
Guest over 1 year ago in InfoWorks ICM / InfoWorks 1 Will not implement

Include weirs and orifices in xpswmm ensemble statistics

Please include weirs and orifices in the ARR Ensemble Statistics summary. Currently, only conduits or natural channels are included.
Guest about 5 years ago in InfoWorks ICM / Results 0 Gathering support

2D Mesh Histogram

When meshing - it would be nice to see a Histogram of Mesh Zone Sizes.
Guest about 2 years ago in InfoWorks ICM / Mesh 0 Gathering support