Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 514 of 1244

Increase RTC Comment Length and Configuration

Currently RTC Comments are limited to 69 characters and only appear within a single box that you need to scroll horizontally to read. Please allow comments to be much larger and have multi-line format so we can add useful comments and explanations...
Dave White 3 months ago in InfoWorks ICM / RTC 0 For Review

RTC Naming

Allow longer names for RTC definitions (Rules, Logic, Variables, etc.). Current limitation of 10 characters for a name is debilitating for more complex logic trees (especially in Global) and does not permit easily named element descriptors.
Dave White 3 months ago in InfoWorks ICM / RTC 0 For Review

Improve print layout functionality

The print layout functionality is incredibly basic and hasn't been improved for several years. At present, we tend to export results out of Infoworks and use 3rd party GIS to produce figures as the Infoworks layout tool isn't sufficient to create ...
Unknown Unknown 8 months ago in InfoWorks ICM / Printing 1 Gathering support

Remove calculations from Notes field

Could Storage Compensation & Numerical Correction calculations be detailed and exported in a separate file (spreadsheet for ease of filtering? possibly date stamped and recording model name, version, path etc) rather than being appended to the...
Giorgio Incelli over 1 year ago in InfoWorks ICM / Other 0 Gathering support

Ability to change mesh ground level values without remeshing

Mesh zones and Mesh level zones are available to change ground level values for the contained 2D meshes, but it will require re-meshing. If we can select 2D meshes by the polygon selection or selection tool and change the mesh elevation values wit...
Miyuki Okuda 5 months ago in InfoWorks ICM / Mesh 1 Already exists

Pump Station Operation Narrative

Would like the ability to add a pump station narrative. For example, a station may have several pumps and varying set points, however those set points do not relate to a specific pump. The station may operate where once the first set point is reac...
Dave White 3 months ago in InfoWorks ICM / Pumps 0 For Review

Update Custom Graph functionality to cover more results

The current custom graph options, including Observed/Predicted and Flexible reports don't cover the full range of results available inside of ICM. This makes creating graphs and reporting the results difficult especially in the River and Water Qua...
Alex Grist 5 months ago in InfoWorks ICM / Reporting 1 Gathering support

Convert 3d points from Civil 3D to cross section lines

River survey sections are provided as 3d points in a DWG file. These need to be converted to channel sections which needs to be done manually. There was previously a feature in RS that allowed the conversion.
Sophia Buchanan 12 months ago in InfoWorks ICM / Import data 0 Gathering support

As a user I want to be able to adjust dry weather flow diurnal profiles easily to account for day light savings

Diurnal wastewater and tradewaste profiles shift over the course of the year due to day light saving time adjustments. I would like to see ICM include the ability to phase shift the diurnal patterns to account for DLS. I believe this adjustment wo...
Guest over 2 years ago in InfoWorks ICM / Calibration 3 Gathering support

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest almost 2 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support