Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWater Pro

Showing 115 of 1423

Please add an Innovyze section to the autodesk forums

Hello, Innovyze previously had a forum available for their products. After the software was purchased by autodesk, this no longer seems to exist. I believe having a forum where users can post questions and troubleshoot their issues would be very h...
Endrit Shabani about 2 years ago in InfoWater Pro / Other 2 In progress

Batch Multi Fire Flow

I want the ability to model many different cases of multi-fire flow in parallel. This is important because I have many areas that require fire flow that is greater than what a single hydrant and later can achieve. Performing this manually for each...
Nathan Gerdts 5 months ago in InfoWater Pro / Automation 0 Gathering support

VSP Control based on Tank Head/Level

Currently you can only use Junction Pressure setpoints or Pump Flow setpoints in the VSP Control dialogue. It would be helpful to be able to use a Tank Level/Head setpoint to adjust the pump speed as well. This is possible in competitor products l...
Grant Clemens almost 3 years ago in InfoWater Pro / Operational Modeling 3 Under consideration

Add a new Special Query for "Demand Junctions" in the Domain Manager

Currently you have to either make your own tediously long query, or you can run a simulation and use output filters, but it should exist as a built-in Special Query.
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 1 Gathering support

InfoSurge constant reporting interval

Often, different InfoSurge runs report results at different intervals, even though the simulation duration is the same. This makes it difficult to do comparisons of results. Please allow the user to set a report timestep like you can with a standa...
Colin Ricks 6 months ago in InfoWater Pro / Productivity 0 For Review

Totalizer Valve and Controls

It would be very useful to have a totalizer valve which closes after a certain amount of flow passes through over a given time, such as 5 MGD over a day, then reopens once that time period has passed. Alternatively, a control option based on a pip...
Guest about 1 year ago in InfoWater Pro / Operational Modeling 1 Under consideration

Add an option to automatically Refresh All graphs in the Report Manager after a new run.

Currently when you complete a new run you have to remember to hit Refresh All in the Report Manager to see latest results. The use-case for viewing old run results is rare, so having an option to automatically refresh all graphs and tables would b...
Grant Clemens almost 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Default tank symbol

Can you change the default tank symbol color back to the dark blue that it used to be? The teal color is very light, making it difficult to see and hard to differentiate from the reservoir symbol. I know I can change this in preferences, but it wo...
Colin Ricks about 1 year ago in InfoWater Pro / Productivity 0 In progress

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Steady state simulations for different times or for average demand

Steady state simulations are useful for 1) evaluating an initial or simplified version of a model (for example with average demands) or 2) evaluating a specific condition (like maximum demand, etc.) without much complexity. If your model is alread...
Felipe Hernandez 7 months ago in InfoWater Pro / Engine 0 Gathering support