Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 535 of 1333

Sub catchment Ground Slope

Currently ICM isn't equipped with the tools to calculate the slope from an underlying ground model or 2D zone so this will need to be determined outside of the program. Can you include the ability for the program to calculate an average catchment ...
Guest about 4 years ago in InfoWorks ICM / Hydrology / Terrain 0 Gathering support

Option to rearrang the object layer in Properties and Themes in alphabetical order

It took time to scan the object layer. It will be usefull to have options to arrange the layer in alphabetical order.
Faizah Ahmad about 2 years ago in InfoWorks ICM / Theme 0 Gathering support

Ability to apply blockage percent

Applying pipe blockage is a standard required in Australia and the functionality in ICM to do this is not user friendly (using blockage links). A simple % pipe blockage in the conduit properties should really be an option. This is particular the c...
Guest almost 4 years ago in InfoWorks ICM / Hydraulics 3 Gathering support

Merge pond and storage nodes and increase their functionality

Pond nodes: - allow variable infiltration at different levels (up to 3 different rates) - allow variable perimeter with level i.e. plan area through which side infiltration can occurs can vary - no porosity function Storage nodes: - 1 porosity va...
Lizzie over 3 years ago in InfoWorks ICM / Hydraulics / SUDS 1 Gathering support

Add Live Maps

We should be able to add Bing Live map, Google Earth Live Map
Guest over 1 year ago in InfoWorks ICM / InfoWorks 0 Gathering support

Option to disable flag colour backgrounds for Custom Labels

When creating a custom label and using field values, the values have a background in the colour of the flag value. In many cases, the flag value is not a suitable colour to be a background and makes the text difficult to read. Could you make an op...
Guest over 5 years ago in InfoWorks ICM / Flags 4 Gathering support

Enable the ability to review Debug Logs from external text editor

The internal Log results editor window is slow when loading over 100K lines. Needless to say - debugging a model where the debug log is 11 GB cant be done in the product, and the workflow to export to file is simply excruciatingly painful. As the ...
Guest over 1 year ago in InfoWorks ICM / Productivity 1 Gathering support

Pruning does not sub reassign drainage links correctly

When pruning, subcatchment drainage manholes are reassigned to the first modeled downstream manhole. However, when pruning subcatchments that drain to single or multiple links, ICM gives incorrect results in some cases and doesn't work at all in o...
Andrew Fugal about 4 years ago in InfoWorks ICM / Productivity 0 Gathering support

River bank cumulative flow

It would be great to have the ability to graph bank flows and have a cumulative flow result available.
Guest over 5 years ago in InfoWorks ICM / River Modeling 1 Gathering support

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom over 1 year ago in InfoWorks ICM / Water Quality 0 Gathering support