Skip to Main Content
Autodesk

Merge pond and storage nodes and increase their functionality

Pond nodes: - allow variable infiltration at different levels (up to 3 different rates) - allow variable perimeter with level i.e. plan area through which side infiltration can occurs can vary - no porosity function Storage nodes: - 1 porosity value (which only works below ground, above ground it is assumed to be 100%) - fixed perimeter for infiltration i.e. assumes cylindrical shape for infiltration (despite the plan area changing with level) - fixed infiltration rate (no change with height) It is not possible to model both porosity and a change in infiltration with height. I propose that pond and storage nodes are merged into 1 unit (they are effectively the same thing anyway). Within the storage-plan area array allow extra columns for: perimeter, porosity and infiltration. There should be a simple tick box to say whether to allow infiltration through the base and/or/neither sides. This functionality would be essential for modelling SuDS for example a biorientation SuDS unit with variable medium at different layers, or a lined infiltration system with no base, but side infiltration etc. At present modelling SuDS units is quite a 'fudge'.
  • Attach files
      Drop here to upload
    • Lizzie
      Reply
      |
      Jan 4, 2022
      ICM request (not MicroDrainage). Thanks