Skip to Main Content
Autodesk

Sub catchment Ground Slope

Currently ICM isn't equipped with the tools to calculate the slope from an underlying ground model or 2D zone so this will need to be determined outside of the program. Can you include the ability for the program to calculate an average catchment slope based on the 2D mesh data or ground model within each sub catchment as an option if this has not been done outside of ICM?
  • Attach files
      Drop here to upload