Skip to Main Content
Autodesk
ADD A NEW IDEA

Simulations

Showing 78 of 1170

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 4 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

Schedule Jobs - remove Any computer

Ability to remove 'Any Computer' option from Schedule jobs window.
Guest over 2 years ago in InfoWorks ICM / Productivity / Simulations 1 Gathering support

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai almost 2 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward 12 months ago in InfoWorks ICM / Results 2 Already exists

Detention Time Modelling

We would like the model to calculate detention time of sewer in a simulation. The idea is similar to water age calculation in WS. The aim is to use this as a proxy for odour study, in essence we would like to be able to create thematic maps to sho...
Guest almost 4 years ago in InfoWorks ICM / Reporting / Results / Wastewater 0 Gathering support

Enable remote simulations with state files without local agent being active

When running (very) long time series, we often split up simulations in shorter blocks and link them via final/initial states (mainly to prevent total loss of results in case something happens near the end of the simulation, and to make results mor...
Guest over 4 years ago in InfoWorks ICM / Performance / Productivity / Simulations 0 Gathering support

As a User I want to use FME (safe.com) to manipulate model data, update the model & extract results.

No description provided
Guest over 4 years ago in InfoWorks ICM / Data Exchange / Network / Results 0 Gathering support

Flags for tracing and long section

Placing flags at any node and having a "connect" button based on network connectivity leads to a big increase in workflow productivity. Flag tracing can be very useful for long section selection, upstream tracing from pump stations, and long secti...
Casey Shannon about 1 year ago in InfoWorks ICM / Results 1 Gathering support

Modelling of Septicity

As a sewer modeller I have occasionally been asked about odour generation in sewer networks. I have noticed that DO (dissolved oxygen) and BOD (biochemical oxygen demand) are both inputs in the wastewater and trade-waste model groups of Infoworks ...
Guest almost 5 years ago in InfoWorks ICM / Results / Simulations / Water Quality 0 Gathering support

Export both the result and the underlying property fields

When the model results are displayed on the webpage through Exchange, since the basic properties need to be viewed, the corresponding basic properties of the results need to be exported first, and then the results are matched to the basic properti...
Liu Qiusheng almost 4 years ago in InfoWorks ICM / Export Data / Simulations 0 Gathering support