Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

normalize demand diagram from live data link

i want be able to normalize the demand diagram profiles when linked to a live link. At this moment I can import water balances , but the 'normalize Daily Values' Button is greyed out. It would be useful to be able to use this
Caroline Heylen 8 months ago in InfoWorks WS Pro / Telemetry 0 For Review

Integration with Cityworks

Integrate with Cityworks CMMS. Rehab actions from Info360 to Cityworks for scheduling and field execution. Work history from Cityworks for risk analysis
Mike Maylone almost 4 years ago in Info360 Asset / Other 0 On roadmap

Adding Sediment Basin Design Function

It would be helpful if we can design sediment basins in infodrainage as another stormwater control and phase
Jenna Woyner over 2 years ago in InfoDrainage / Other 2 Will not implement

Failure Rate Prediction from rehab spending scenarios

A key function that I'd like to see would be the ability to provide predictions of future failure rates associated with rehab budget scenarios. To gain approval for future budgetary settings, i intend to run a number of deterioration model runs wi...
daan van riel 8 months ago in Info360 Asset / Query types / Capabilities 1 In progress

Long Section to AutoCAD DWG

As the Alternative Results in the Long Section are bogus (they are not Level or height above datum) instead are displayed as depth above invert) - we need a better way to compare existing simulation results and proposed results in a long section. ...
Guest almost 2 years ago in InfoWorks ICM / Productivity 1 Will not implement

Pump Symbol Direction in Long Section

When generating a long section, the pump symbol in the strip plan always points left to right (all "directional" link symbols point left to right). It would be great to have them display in the correct direction, i.e. flip the symbol if the long s...
Daniel Alexander 8 months ago in InfoWorks WS Pro / Other 1 Under consideration

Add a “Restore Version as Latest” Function in InfoWorks WS Pro

In InfoWorks WS Pro, it is currently not possible to restore an earlier network version and promote it as the latest version. If a mistake is made in a newer version (e.g., Version 194), the only available workaround is to copy or branch from the ...
Guest 8 months ago in InfoWorks WS Pro / Productivity 0 For Review

Split a subcatchment

To be able to easily split a subcatchment into 2 separate subcatchments. For example when it becomes obvious that the flow from a subcatchment cannot be collected at a pit (node), it becomes necessary to insert an additional pit (node) to captur...
Gregory Smith over 4 years ago in InfoWorks ICM / Hydrology 3 Already exists

Add a Brownfield Runoff tool under Preliminary Sizing > Calculators in the ribbon

To assist with initial site assessment, a brownfield runoff tool with printable reporting for the chosen rainfall events would be useful in the Preliminary sizing ribbon to allow analysis of brownfield and greenfield runoff rates from the same loc...
Guest over 2 years ago in InfoDrainage / Hydrology 2 Already exists

Need additional Timestep function for "Between episodes" of "Simulation runoff only"

It needs creating a new Timestep function in ICM Run window that allows setting up timestep for "Simulation runoff only" for the "Between episodes" separately with "Timestep (s)" in Run window. This new function saves a lot of running time when th...
Guest almost 4 years ago in InfoWorks ICM / Events / Simulations 0 Gathering support