Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1369 of 1369

4K Screen

Not everything works well with 4K monitors (grips). Let's get real 4K workflow - not just a DPI scaling solution.
Guest almost 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Optimize PRV Settings, including flow modulated PRVs

I want a tool that can help define the minimum pressure setting at a PRV to provide required pressure to downstream customers under expected demands. In addition, in cases where I have flow modulated PRV's, I want the tool to provide a curve of pr...
Guest about 4 years ago in InfoWorks WS Pro / Automation 0 Gathering support

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan about 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Add Vertex Workflow

The Edit Geometry Workflow for adding, and editting vertex is fragile. Inserting a vertex breaks the linear aspect of the 2D boundary as InfoWorks does not provide any feedback. Autodesk workflows in Civil 3D, InfraWorks, and Revit provide user fe...
Guest about 2 years ago in InfoWorks ICM / Mesh 0 Gathering support

Data Pipelines to extract/transform/load I360A data to Esri

Esri came out with Data Pipelines at the end of 2024 Data Pipelines is an ETL (extract, transform, load) tool within the ArcGIS Online platform. It will eventually be available in Enterprise as well. Data Pipelines allow users to pull data from va...
Todd Plank 8 months ago in Info360 Asset / Esri 0 For Review

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

Vertical Asset Hierarchy to limit # of Calculations, Alerts, and Workspaces required.

He have a ton of clients who has more than one of the same asset that needs to be evaluated. If the data has a hierarchy that is referenceable, allowing for a user to only have to create one "Biz Block" calculation for all of the same assets, or t...
Guest almost 5 years ago in Info360 Insight 1 Gathering support

Please provide Intellisense to the SQL Editor in ICM

I want the SQL Editor to help me write SQL queries by color coding and autocompleting data, similar to Intellisence.
Guest about 6 years ago in InfoWorks ICM / SQL 0 Gathering support

Only update interpreted points on Bank Line when updating from Ground Model

When updating bank lines from ground model it would be useful to have an option was available to only update the interpreted points, therefore retaining vertices heights from cross sections and surveyed points. Or an option to easily delete the in...
Guest over 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support