Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 728

4K Screen

Not everything works well with 4K monitors (grips). Let's get real 4K workflow - not just a DPI scaling solution.
Matt Anderson about 1 year ago in InfoWorks ICM / Productivity 0 Gathering support

Import selection lists from CSV

A simple request - can we have the ability to create csv files of selection lists that could then be imported into ICM?
Richard Body almost 5 years ago in InfoWorks ICM / Productivity 1 Gathering support

Wide "Oval" shape ID

conduit shape ID "Oval" only allows Height > With. So for "horizontally" wide oval conduits a new conduit shape has te be defined. It would be practical if the standard "Oval" also allows a with greater than the hight.
Guest about 5 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Add Vertex Workflow

The Edit Geometry Workflow for adding, and editting vertex is fragile. Inserting a vertex breaks the linear aspect of the 2D boundary as InfoWorks does not provide any feedback. Autodesk workflows in Civil 3D, InfraWorks, and Revit provide user fe...
Matt Anderson over 1 year ago in InfoWorks ICM / Mesh 0 Gathering support

Allow the user to choose the flood type of pond or storage nodes

Allow the user to choose the flood type of pond or storage nodes from a drop down as is the case for manholes. As opposed to the current state where the flood type depends on the relationship between the highest level entry in the storage array an...
Lizzie over 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Remove "Delete simulation" option from "Results Manager"

Within the "Results Manager" window, "Delete time-varying results files" and "Delete all results files" are very useful tools - with this being the go-to method within my team for removing no-longer-needed results files. However, I have never seen...
Jason Kulsdom over 1 year ago in InfoWorks ICM / Simulations 3 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest 10 months ago in InfoWorks ICM / Inlets 0 Gathering support

As an organization, we would like the ability to choose an alternative final risk calculation method.

So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model. It would great if the user could choose the ...
Guest about 5 years ago in Other Product Ideas / Asset Management 5 Gathering support

Add ability to rename datasets, patterns, queries, etc

1. Allow the "Change ID" tool to rename datasets, patterns, queries, etc. 2. Make the "Change ID" window wider or resizeable to fit longer IDs.
Colin Ricks about 5 years ago in InfoWater Pro / Productivity 1 Gathering support

Control units precision in long plots and grid plots

it would be nice to be able to control unit precision such as volume in m3 to a whole number when reported volume is in the 400000 m3. we do not need to see 4 digits past the decimal!!
John Krpan 11 months ago in InfoWorks ICM / Long Section / Profile 0 Gathering support