Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1369 of 1369

Field for CCTV scoring standard used

Need a field to display the standard used to score the approved survey. It should say 'NASSCO PACP v6' or 'MSCC' and all the other defect standards. Right now there is no field so you can't tell whether a pipe inspection was scored using PACP v6 o...
Tim Medearis over 4 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Use edit flag for selection of fields only

By using the Use edit flag option, all changed fields are now set to the edit flag. For a lot of fields (for example the us and ds node or the suffix) it is not necessary to set this flag to the Edit flag.
Guest almost 6 years ago in InfoWorks ICM / Flags 0 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Improvement on the Numerical Correction Process in ICM

The current procedure for ‘Numerical Correction’ in ICM requires users to remove any existing values to calculate the correction (for Preismann and Base flow) before the inbuilt routine is run. If this wasn't made the calculated correction values ...
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

I want to be able to open a layer list using Exchange (Ruby)

As part of a ruby script, I would like to add a specific layer list to a network to enable a Spatial SQL to be run. This script needs to be run on all our networks as part of a regular update. We have 1100 models which would require an extensive m...
Jose Pereira over 4 years ago in InfoWorks ICM / API / Exchange 0 Gathering support