Reference model results in Rehab decisions

As an asset manager, I want to reference simulation results while scheduling activities. For example, I want to schedule flushing on pipes that have a very low peak velocity on typical conditions that haven't been flushed in a while.
Or I could reference when pipes are flagged for future upsizing due to capacity when deciding which high risk pipes to work on.

  • Attach files
      Drop here to upload
    • Admin
      Tony Andrews
      Apr 10, 2024

      Great idea! The rehab decision tree would reference the simulation results providing velocity calcs in combination with historic flushing work tasks.