Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Sort selection sets/ re-order them

Would be very useful if you could either sort selection set orders or move selections up or down the list. This would make it much faster to find the selection set you want in a large list (e.g. DMA selection sets in alphabetical order)
Duncan Allen about 6 years ago in InfoWorks WS Pro 1 Gathering support

Temperature variation for the PSO bulk chlorine decay model in the MSQ module of InfoWorks

The reactive-constituent (PSO) chlorine decay model (Fisher et al. 2017) was provided to users in the MSQ module of InfoWorks in July 2020 (see the MSQ blog for details). A major advantage of this model is that only a single set of four model coef...
Guest almost 5 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Add ability to delete data import log entries

Having multiple data imports of the same name that failed or were partially successful can be confusing. The ability to delete entries from the log would help keep records clear and organized. Users generally want more control, not less over their...
Daniel'le DeVoss over 2 years ago in Info360 Asset 0 Will not implement

Application of design storms in ICMLive

We'd like to be able to predefine some design storms in ICMLive (note that this is NOT the same as design rainfall in ICM). The idea is that we'd have these storms that could be optionally applied by operators to see the likely effect of a rainfal...
Richard Body about 6 years ago in InfoWorks ICM / Live Modeling / Rainfall 0 Gathering support

Triggers - Automation

Workflow automation in Info360 Asset. Take any process or analytic and set triggers to kick it off along with other processes downstream Example: New CCTV inspection approved Triggers Risk model run Triggers Rehab tree run Triggers New reha...
Mike Maylone over 3 years ago in Info360 Asset / Product workflows 0 On roadmap

Import Z value from CAD/SIG 3D line to the Bridge Opening table of a 2D Bridge structure

When creating a user defined opening, it is really painfull to use the table editor. Why do not create an import feature that import X,Y an Z value from a 3D CAD line (such as the soffit CAD line) into the opening table property ? It will simplify...
Raphael BAUBION about 1 year ago in InfoWorks ICM / InfoWorks 1 Gathering support

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body about 6 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

Work Order Close & Follow Up

No description provided
Mike Maylone over 3 years ago in Info360 Asset / Work Management 0 Under consideration

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest over 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest over 2 years ago in InfoWorks ICM / Inlets 0 Gathering support