Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1338 of 1338

Improvements to "Edit Attributes" table

The "Edit Attributes" window (accessed by using the "Edit Selection" or "Edit Domain" buttons) is a useful table to quickly view and edit all the physical information for each facility type together. However, it has some useability issues that som...
Colin Ricks over 1 year ago in InfoWater Pro / Productivity 0 Gathering support

Ability to view and navigate to inspections directly from the Risk results table

See SAASAM-I-208 Include an Inspection ID column in the risk results table that contains link to the most recent inspection associated to the asset. This will enable more efficient navigation to the inspection data related that was used in the ris...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

Convergence Errors be resolved automatically while the model is simulated

Sometime a TSR running for few weeks throws up convergence hence these sims need to be rerun with shorter timestep which is both inefficient and a lot of time is wasted. It would be good if somehow the simulations dialog allowed to run the model w...
Salam Jamadar over 4 years ago in InfoWorks ICM / Performance / Simulations 0 Gathering support

Restrict user ability to "Empty Recycle Bin"

Ideally it would be good to give a couple of named users the ability to empty the recycle bin - everyone else can send things TO the recycle bin, and can go into the bin to recover 'deleted' items, but they won't be able to empty it. This function...
Jason Kulsdom about 3 years ago in InfoWorks ICM / Productivity 0 Gathering support

Can the simulation log file be broken up into sections

Can the simulation log file be broken up into sections, as models get bigger and many with several 2d zone trying to find what is actual causing a simulations failure is becoming a bit more difficult having to scroll through big log files for that...
Guest over 4 years ago in InfoWorks ICM / Errors / Reporting 0 Gathering support

Option to pan through 2 or multiple geoplans at the same time

Sometimes (in ICM and IAM) in comparing 2 (or more) networks visually the networks are most of the time tiled horizontally of vertically. But when panning through one network, it would be very convenient that the other network(s) is/are also movin...
Guest over 4 years ago in InfoWorks ICM / Productivity 0 Gathering support

Integrate w/Infor EAM

Specifically for City of Portland and City of Houston, would like to be able to integrate their data being collected in Infor including work order information.
Mike Maylone over 4 years ago in Info360 Asset / Other 1 Gathering support

Report InfoSWMM available capacity against theoretical flow for specified d/D

InfoSWMM provides Pipe/Conduit summary report with values for Max flow divided by "Full Flow". Here the "full flow" is based on Manning's equation for when the pipe is full. However as a sewer utility, we're not allowed to fill pipes. We must keep...
Guest over 4 years ago in InfoWorks ICM / Grids / Reporting 2 Gathering support

Visibility by system type

It would be usefull to have the possibility to easily switch on and off the layers of different system types by ticking on and of the different types/layers in the Geoplan Layers and Themes. By using the themes and adding visibility it is possib...
Richard Wilbrink about 3 years ago in InfoWorks ICM / GIS Layers 3 Gathering support

Report volume stored in all tanks

I can calculate volume from level, but it's an extra step and requires that I copy the run results out to Excel. It's even more difficult if I have a non-circular tank. Please include tank volume in the tank results and in the "System Demand" report.
Colin Ricks almost 5 years ago in InfoWater Pro / Productivity 1 Gathering support