Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1383 of 1383

Liquid filled/Flooded drainage network

Liquid filled/Flooded drainage network- the system should be required to design flooded drainage network i.e. drainage pipe should be always filled with liquid for entire length up to the discharge point. Like a surcharge up to manhole cover (liqu...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

dark mode

for people that are spending a big amount of time in ICM, a dark mode would be ideal, don't know why this hasn't been implemented yet, since most of the apps have this option and there isn't really any option to change the appearence colours in th...
Ionut Pintea about 2 years ago in InfoWorks ICM / Visualization 2 Gathering support

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

Set up runs more efficiently

Is there a matrix type tool in ICM that allows you to easily set up complicated run set ups? i.e. for this 1 Model Network, these runs with use these rainfall files, inflow files, WWG, etc are needed. Model Name Base Model Rainfall Inflow WWG...
Guest almost 6 years ago in InfoWorks ICM / Productivity / Simulations 0 Gathering support

Provide a "Remove elements from domain" option within DB Editor, Edit Domain Attributes, and tabular results report

I would like to be able to remove items from the domain as I review them within DB Editor, Edit Domain Attributes, and tabular results report tables, similar to the "Append to Domain" available when "right clicking" on an item in DB Editor.
Guest 2 months ago in InfoWater Pro / Productivity 0 For Review

Button: Apply to all phases

To each of the build screens, next to "apply", add another button, "apply to all phases". This would save a lot of time when making tweaks to models for which more than one phase is being run (which is most models)
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 9 months ago in InfoWorks ICM / Validation 0 For Review

Displaying GIS layers above network objects

In ICM, files added through the GIS layer control dialog are displayed below the objects. Could you add a feature to display them above the objects? For example, when representing roads with shp files, displaying these backgrounds above the object...
Nami Ikarashi 9 months ago in InfoWorks ICM / GIS Layers 1 For Review

Pipe names missing in export from Civil3D

When exporting pipes from Civil3D to Infodrainage, the pipe names keep reverting to the autogenerated names given when pipe is created in Civil3D even though they were renamed in Civil3D.
Jenna Woyner almost 2 years ago in InfoDrainage / Civil3D Integration 1 Under consideration

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap