Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Control units precision in long plots and grid plots

it would be nice to be able to control unit precision such as volume in m3 to a whole number when reported volume is in the 400000 m3. we do not need to see 4 digits past the decimal!!
John Krpan almost 2 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

Pipe incident data flow through to Asset for risk and rehab analysis

It would be useful if pipe failures relating to pipe leaks and bursts could be fed through to Info360 Asset for use in risk and rehab determinations
Brad Thompson over 2 years ago in Info360 Insight / Asset 0 Under consideration

Add a modelling confidence field into the User Defined Flags

This could simply be an additional free text field in the "User Defined Flags" window labelled "confidence" OR the user is able to define their own but they are limited to 5-7 options. The benefit is that when users pick up a model they better u...
Alex Grist over 6 years ago in InfoWorks ICM / Flags 0 Gathering support

Allow user default sorting of Master Database, and sorting of Layers and Themes properties

In InfoWorks ICM, allow the user to choose the default sorting of the Master Database and allow sorting of the Layers and Themes in Geoplan Properties and Themes. I would like to be able to have the master database automatically/default sorted ba...
Dave White over 6 years ago in InfoWorks ICM / Productivity 4 Gathering support

Export river cross sections for an ICM model

At present, ICM river cross sections can only be exported to dwg one by one. It would be helpful to be able to export all the modelled cross sections in a single operation (eg via data export centre)
Guest over 4 years ago in InfoWorks ICM / Export Data / River Modeling 1 Already exists

Add SWMM5 Ideal Pump to InfoWorks ICM

Does InfoWorks ICM have an equivalent to an ideal pump in SWMM which pumps whatever is entering the SPS out of the SPS? It would be a good feature to include into infoworks as I needed to play around a bit to get it. I found I had to add line 2 ...
Guest over 6 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest almost 2 years ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

GIS Gateway default Value

While updating the model from GIS and importing new objects, I want a user-defined Default value column for each field. If the source GIS is missing values, or there is no appropriate field to populate, fill in the model attribute using the defaul...
Nathan Gerdts almost 2 years ago in InfoWater Pro / Data Exchange 1 Gathering support

Ability to customize tool tips.

It allows the user to access information much quicker while conducting reviews in the map.
Martha Nunez almost 2 years ago in Info360 Asset 1 Gathering support

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydra...
Guest 11 months ago in InfoWater Pro / Other 0 For Review