Skip to Main Content
Autodesk

Use consistent terminology in the Fireflow Results Report

The Fireflow Results Report uses the following terms for what I believe are the same thing: Total Demand, Design Flow, & Fire Demand. If these are not the same in the context of this report then explain their differences. Also, the term "Hydrant" is used to refer to the Junction where the fire demand is applied which can be confusing. I suggest call it "Fireflow Junction" or "Fire Demand Junction".

  • Attach files
      Drop here to upload