Skip to Main Content
Autodesk
ADD A NEW IDEA

River Modeling

Showing 26 of 1183

Dissolve river reaches into multiple river reaches

It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite...
Guest almost 5 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Export river cross sections for an ICM model

At present, ICM river cross sections can only be exported to dwg one by one. It would be helpful to be able to export all the modelled cross sections in a single operation (eg via data export centre)
Guest over 3 years ago in InfoWorks ICM / Export Data / River Modeling 0 Gathering support

Optional channel to river reachs option

The way ICM identifies the centre-line of the river reach is by using the point with the lowest invert level. Regardless of the shape of the channels of how much is the value of the X coordinate, didn't affect the appearance of the section to gene...
Liu Qiusheng over 4 years ago in InfoWorks ICM / Network / River Modeling 0 Gathering support

Intelligently select nodes in river reaches

When clicking on a node over a subcatchment, the software can recognise the user is after the node. When the same is done for a node on a river reach, the node is not automatically selected but rather the choice is presented to the user.
Guest almost 5 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Alert on river sections without having to make 1D results points

We'd like to create alerts on river sections without having to create either results points or having the reach split at the cross section in question
Richard Body almost 5 years ago in InfoWorks ICM / Live Modeling / River Modeling 0 Gathering support

Water environmental capacity calculation

Add environmental capacity calculation in ICM, user can easily find how much pollution the river can receive at each time step and each river’s total environment capacity during the whole simulatiton. Water Environmental Capacity Calculation Backg...
Liu Qiusheng about 5 years ago in InfoWorks ICM / River Modeling / Water Quality 0 Gathering support